Wage determination TX20260035
Texas · Heavy · Active · Standard
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1) · download CSV
| Classification | Rate | Fringe |
|---|---|---|
| ELECTRICIAN: HEAVY CONSTRUCTION (INCLUDING WATER/SEWER LINES) | $27.50 | $9.30 |
| TRUCK DRIVER | $9.17 | $0.00 |
| POWER EQUIPMENT OPERATOR: GRADER | $11.19 | $0.00 |
| POWER EQUIPMENT OPERATOR: FRONT END LOADER | $10.43 | $0.00 |
| POWER EQUIPMENT OPERATOR: BACKHOE | $11.57 | $0.00 |
| LABORERS: (PIPELAYER) | $8.48 | $0.00 |
| LABORERS: (COMMON) | $7.96 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $9.29 | $0.00 |
| CARPENTER, INCLUDES FORM WORK | $12.21 | $0.00 |