Heavy construction wages: Nueces, San Patricio, Texas
Wage determination TX20260021 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/TX20260021 on · latest revision 1 · verify at sam.gov/wage-determination/TX20260021/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: MOTOR GRADER | $8.72 | $0.00 | $8.72 |
| POWER EQUIPMENT OPERATORS: (BACKHOE) | $9.21 | $0.00 | $9.21 |
| LABORERS: (UTILITY) | $7.68 | $0.00 | $7.68 |
| LABORERS: (COMMON) | $7.25 | $0.00 | $7.25 |
| ELECTRICIAN | $13.37 | $2.58 | $15.95 |
| CONCRETE FINISHER | $7.56 | $0.00 | $7.56 |
| CARPENTER (EXCLUDING FORM SETTING) | $9.05 | $0.00 | $9.05 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.