Residential construction wages: Collin + 5 more counties, Texas
Wage determination TX20260014 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/TX20260014 on · latest revision 1 · verify at sam.gov/wage-determination/TX20260014/1
CollinDallasDentonEllisKaufmanRockwall
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER | $7.25 | $0.00 | $7.25 |
| TILE SETTER | $8.54 | $0.00 | $8.54 |
| ROOFER | $8.54 | $0.00 | $8.54 |
| POWER EQUIPMENT OPERATORS: GRADER | $11.25 | $0.00 | $11.25 |
| POWER EQUIPMENT OPERATORS: FRONT END LOADER | $12.42 | $0.00 | $12.42 |
| POWER EQUIPMENT OPERATORS: BULLDOZER | $11.61 | $0.00 | $11.61 |
| PLUMBER (EXCLUDING HVAC WORK) | $11.57 | $0.00 | $11.57 |
| PAINTER: BRUSH ONLY (INCLUDING DRYWALL TAPING/FINSHING) | $10.47 | $0.00 | $10.47 |
| LABORERS:, EXCLUDING BATT INSULATION (LANDSCAPE) | $7.25 | $0.00 | $7.25 |
| LABORERS: EXCLUDING BATT INSULATION (MASON TENDER (INCLUDING CEMENT AND BRICK)) | $7.25 | $0.00 | $7.25 |
| LABORERS: EXCLUDING BATT INSULATION (COMMON) | $7.25 | $0.00 | $7.25 |
| INSULATOR - BATT | $15.00 | $0.00 | $15.00 |
| HVAC MECHANIC (INCLUDING PIPE, EXCLUDING DUCT) | $9.93 | $1.13 | $11.06 |
| FORM SETTER | $10.90 | $0.00 | $10.90 |
| ELECTRICIAN | $10.42 | $0.00 | $10.42 |
| DRYWALL HANGER | $10.00 | $0.00 | $10.00 |
| CEMENT MASON/CONCRETE FINISHER (EXCLUDING FORM SETTING) | $10.77 | $0.00 | $10.77 |
| CARPENTER (EXCLUDING DRYWALL HANGING BATT INSULATION, FORM SETTING) | $9.28 | $0.00 | $9.28 |
| BRICKLAYER | $10.80 | $0.00 | $10.80 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.