Building construction wages: Williamson, Tennessee
Wage determination TN20260192 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/TN20260192 on · latest revision 1 · verify at sam.gov/wage-determination/TN20260192/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $38.17 | $18.82 | $56.99 |
| ELEVATOR MECHANIC PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | $52.81 | $38.44 | $91.25 |
| IRONWORKER: ORNAMENTAL | $35.32 | $17.07 | $52.39 |
| IRONWORKER, STRUCTURAL | $35.32 | $17.07 | $52.39 |
| IRONWORKER, REINFORCING | $35.32 | $17.07 | $52.39 |
| PLUMBER | $46.02 | $19.63 | $65.65 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION) | $34.95 | $16.66 | $51.61 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $35.37 | $15.99 | $51.36 |
| TRUCK DRIVER: DUMP TRUCK | $15.28 | $0.00 | $15.28 |
| TILE SETTER | $19.65 | $0.00 | $19.65 |
| TILE FINISHER | $14.00 | $0.00 | $14.00 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $20.87 | $9.81 | $30.68 |
| ROOFER | $17.00 | $0.00 | $17.00 |
| PIPEFITTER | $29.54 | $12.41 | $41.95 |
| PAINTER (BRUSH AND ROLLER) | $14.30 | $0.00 | $14.30 |
| OPERATOR: ROLLER | $14.35 | $0.00 | $14.35 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $14.70 | $0.00 | $14.70 |
| OPERATOR: FORKLIFT | $15.00 | $0.00 | $15.00 |
| OPERATOR: DRILL | $26.50 | $4.09 | $30.59 |
| OPERATOR: CRANE | $26.50 | $2.81 | $29.31 |
| OPERATOR: BULLDOZER | $28.19 | $9.65 | $37.84 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $16.84 | $0.00 | $16.84 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.50 | $0.00 | $24.50 |
| LABORER: PIPELAYER | $14.99 | $2.41 | $17.40 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $15.97 | $0.00 | $15.97 |
| LABORER: MASON TENDER - BRICK | $13.54 | $0.00 | $13.54 |
| LABORER: COMMON OR GENERAL | $12.49 | $0.00 | $12.49 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $16.12 | $0.00 | $16.12 |
| LABORER GRADE CHECKER | $13.01 | $0.00 | $13.01 |
| LABORER DEMOLITION | $16.74 | $0.00 | $16.74 |
| HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY) | $18.00 | $0.79 | $18.79 |
| GLAZIER | $16.00 | $1.11 | $17.11 |
| ELECTRICIAN | $22.53 | $8.00 | $30.53 |
| CEMENT MASON/CONCRETE FINISHER | $22.79 | $0.00 | $22.79 |
| CARPENTER, EXCLUDES DRYWALL HANGING | $19.50 | $0.00 | $19.50 |
| CARPENTER (DRYWALL HANGING ONLY) | $18.32 | $0.00 | $18.32 |
| BRICKLAYER | $20.00 | $0.00 | $20.00 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.