Highway construction wages: Anderson + 5 more counties, South Carolina
Wage determination SC20260037 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/SC20260037 on · latest revision 1 · verify at sam.gov/wage-determination/SC20260037/1
AndersonGreenvilleLaurensPickensSpartanburgYork
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: LOWBOY TRUCK (GREENVILLE, LAURENS, PICKENS) | $13.36 | $0.00 | $13.36 |
| TRUCK DRIVER: LOWBOY TRUCK (ANDERSON, SPARTANBURG, YORK) | $13.48 | $0.00 | $13.48 |
| TRUCK DRIVER: DUMP TRUCK (LAURENS, PICKENS) | $12.70 | $0.00 | $12.70 |
| TRUCK DRIVER: DUMP TRUCK (GREENVILLE) | $13.17 | $0.00 | $13.17 |
| TRUCK DRIVER: DUMP TRUCK (ANDERSON, SPARTANBURG, YORK) | $12.75 | $0.00 | $12.75 |
| POWER EQUIPMENT OPERATOR: TRACTOR | $13.28 | $0.00 | $13.28 |
| POWER EQUIPMENT OPERATOR: SCREED | $13.09 | $0.00 | $13.09 |
| POWER EQUIPMENT OPERATOR: SCRAPER | $12.71 | $0.00 | $12.71 |
| POWER EQUIPMENT OPERATOR: ROLLER (LAURENS, PICKENS) | $12.16 | $0.00 | $12.16 |
| POWER EQUIPMENT OPERATOR: ROLLER (GREENVILLE) | $12.59 | $0.00 | $12.59 |
| POWER EQUIPMENT OPERATOR: ROLLER (ANDERSON, SPARTANBURG, YORK) | $12.11 | $0.00 | $12.11 |
| POWER EQUIPMENT OPERATOR: PAVER (GREENVILLE, LAURENS, PICKENS) | $13.61 | $0.00 | $13.61 |
| POWER EQUIPMENT OPERATOR: PAVER (ANDERSON, SPARTANBURG, YORK) | $12.93 | $0.00 | $12.93 |
| POWER EQUIPMENT OPERATOR: MECHANIC | $17.75 | $0.00 | $17.75 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) | $16.80 | $0.00 | $16.80 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (GREENVILLE, LAURENS, PICKENS) | $12.62 | $0.00 | $12.62 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (ANDERSON, SPARTANBURG, YORK) | $13.13 | $0.00 | $13.13 |
| POWER EQUIPMENT OPERATOR: CRANE | $19.73 | $0.00 | $19.73 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $12.95 | $0.00 | $12.95 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (SPARTANBURG, YORK) | $13.92 | $0.00 | $13.92 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (GREENVILLE, LAURENS, PICKENS) | $13.82 | $0.00 | $13.82 |
| POWER EQUIPMENT OPERATOR: (MILLING MACHINE) | $11.84 | $0.00 | $11.84 |
| POWER EQUIPMENT OPERATOR: (HYDROSEEDER) | $11.00 | $0.00 | $11.00 |
| LABORER: PIPELAYER | $13.98 | $0.00 | $13.98 |
| LABORER: MASON TENDER-CEMENT/CONCRETE | $10.40 | $0.00 | $10.40 |
| LABORER, TRAFFIC CONTROL-FLAGGER (GREENVILLE, LAURENS, PICKENS) | $10.62 | $0.00 | $10.62 |
| LABORER, TRAFFIC CONTROL-FLAGGER (ANDERSON, SPARTANBURG, YORK) | $10.13 | $0.00 | $10.13 |
| LABORER, COMMON OR GENERAL (YORK) | $9.63 | $0.00 | $9.63 |
| LABORER, COMMON OR GENERAL (SPARTANBURG) | $10.05 | $0.00 | $10.05 |
| LABORER, COMMON OR GENERAL (LAURENS) | $8.89 | $0.00 | $8.89 |
| LABORER, COMMON OR GENERAL (GREENVILLE, PICKENS) | $9.87 | $0.00 | $9.87 |
| LABORER, COMMON OR GENERAL (ANDERSON) | $9.71 | $0.00 | $9.71 |
| LABORER, ASPHALT INCLUDES ASPHALT DISTRIBUTOR, SHOVELER, AND SPREADER (YORK) | $11.62 | $0.00 | $11.62 |
| LABORER, ASPHALT INCLUDES ASPHALT DISTRIBUTOR, SHOVELER, AND SPREADER (ANDERSON, GREENVILLE, LAURENS, PICKENS, SPARTANBURG) | $11.54 | $0.00 | $11.54 |
| LABORER (TRAFFIC CONTROL-CONE SETTER) | $11.75 | $0.00 | $11.75 |
| LABORER (LUTEMAN) | $10.76 | $0.00 | $10.76 |
| IRONWORKER, REINFORCING | $15.02 | $0.00 | $15.02 |
| CEMENT MASON/CONCRETE FINISHER | $12.64 | $0.00 | $12.64 |
| CARPENTER (FORM WORK ONLY) | $14.44 | $0.00 | $14.44 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.