Highway construction wages: Calhoun + 5 more counties, South Carolina
Wage determination SC20260035 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/SC20260035 on July 24, 2026 · latest revision 1 · verify at sam.gov/wage-determination/SC20260035/1
CalhounFairfieldKershawLexingtonRichlandSaluda
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: MECHANIC | $15.25 | $0.00 | $15.25 |
| TRUCK DRIVER: LOWBOY TRUCK | $14.11 | $0.00 | $14.11 |
| TRUCK DRIVER: DUMP TRUCK (LEXINGTON) | $13.22 | $0.00 | $13.22 |
| TRUCK DRIVER: DUMP TRUCK (CALHOUN, FAIRFIELD, KERSHAW, RICHLAND, SALUDA) | $13.29 | $0.00 | $13.29 |
| POWER EQUIPMENT OPERATOR: TRACTOR | $13.28 | $0.00 | $13.28 |
| POWER EQUIPMENT OPERATOR: SCREED | $13.56 | $0.00 | $13.56 |
| POWER EQUIPMENT OPERATOR: SCRAPER | $12.71 | $0.00 | $12.71 |
| POWER EQUIPMENT OPERATOR: ROLLER (LEXINGTON) | $15.10 | $0.00 | $15.10 |
| POWER EQUIPMENT OPERATOR: ROLLER (CALHOUN, FAIRFIELD, KERSHAW, RICHLAND, SALUDA) | $14.98 | $0.00 | $14.98 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) | $17.22 | $0.00 | $17.22 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (LEXINGTON) | $18.54 | $0.00 | $18.54 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (CALHOUN, FAIRFIELD, KERSHAW, RICHLAND, SALUDA) | $18.44 | $0.00 | $18.44 |
| POWER EQUIPMENT OPERATOR: CRANE | $18.93 | $0.00 | $18.93 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $17.38 | $0.00 | $17.38 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (LEXINGTON) | $16.02 | $0.00 | $16.02 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (CALHOUN, FAIRFIELD, KERSHAW, RICHLAND, SALUDA) | $15.98 | $0.00 | $15.98 |
| POWER EQUIPMENT OPERATOR: (PAVER) | $13.93 | $0.00 | $13.93 |
| POWER EQUIPMENT OPERATOR: (MILLING MACHINE) | $11.84 | $0.00 | $11.84 |
| POWER EQUIPMENT OPERATOR: (HYDROSEEDER) | $11.00 | $0.00 | $11.00 |
| LABORER: PIPELAYER | $14.46 | $0.00 | $14.46 |
| LABORER: MASON TENDER-CEMENT/CONCRETE | $10.40 | $0.00 | $10.40 |
| LABORER, TRAFFIC CONTROL-CONE SETTER (LEXINGTON) | $11.26 | $0.00 | $11.26 |
| LABORER, TRAFFIC CONTROL-CONE SETTER (CALHOUN, FAIRFIELD, KERSHAW, RICHLAND, SALUDA) | $10.87 | $0.00 | $10.87 |
| LABORER, COMMON OR GENERAL (SALUDA) | $9.88 | $0.00 | $9.88 |
| LABORER, COMMON OR GENERAL (RICHLAND) | $9.97 | $0.00 | $9.97 |
| LABORER, COMMON OR GENERAL (LEXINGTON) | $9.78 | $0.00 | $9.78 |
| LABORER, COMMON OR GENERAL (KERSHAW) | $9.88 | $0.00 | $9.88 |
| LABORER, COMMON OR GENERAL (FAIRFIELD) | $9.55 | $0.00 | $9.55 |
| LABORER, COMMON OR GENERAL (CALHOUN) | $10.09 | $0.00 | $10.09 |
| LABORER (TRAFFIC CONTROL-FLAGGER) | $11.07 | $0.00 | $11.07 |
| LABORER (LUTEMAN) | $11.61 | $0.00 | $11.61 |
| LABORER (ASPHALT INCLUDES ASPHALT DISTRIBUTOR, SHOVELER, AND SPREADER) | $11.54 | $0.00 | $11.54 |
| IRONWORKER, REINFORCING | $15.02 | $0.00 | $15.02 |
| GUARDRAIL INSTALLER (INCLUDES GUARDRAIL/POST DRIVER WORK) | $12.49 | $0.00 | $12.49 |
| CEMENT MASON/CONCRETE FINISHER | $13.65 | $0.00 | $13.65 |
| CARPENTER, FORM WORK ONLY (LEXINGTON) | $14.50 | $0.00 | $14.50 |
| CARPENTER, FORM WORK ONLY (FAIRFIELD, KERSHAW, RICHLAND, SALUDA) | $15.04 | $0.00 | $15.04 |