Building construction wages: Aiken, Edgefield, South Carolina
Wage determination SC20260032 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/SC20260032 on · latest revision 1 · verify at sam.gov/wage-determination/SC20260032/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN WORK FROM SWINGING BOSON CHAIRS, SPIDERS, AND/OR SIMILAR DEVICES: 20% PER HOUR ADDITIONAL | $32.25 | $16.95 | $49.20 |
| CEMENT MASON/CONCRETE FINISHER | $27.70 | $11.05 | $38.75 |
| PIPEFITTER | $31.70 | $16.56 | $48.26 |
| TRUCK DRIVER | $14.05 | $3.18 | $17.23 |
| ROOFER | $12.21 | $0.00 | $12.21 |
| PLUMBER | $16.86 | $0.95 | $17.81 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $12.00 | $0.00 | $12.00 |
| OPERATOR: LOADER | $14.18 | $1.99 | $16.17 |
| OPERATOR: GRADER/BLADE | $17.50 | $1.78 | $19.28 |
| OPERATOR: CRANE | $19.39 | $2.02 | $21.41 |
| OPERATOR: BULLDOZER | $17.07 | $2.65 | $19.72 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.81 | $2.67 | $19.48 |
| LABORER: PIPELAYER | $14.69 | $2.08 | $16.77 |
| LABORER: MASON TENDER-BRICK/CONCRETE/CEMENT/STONE | $11.00 | $0.00 | $11.00 |
| LABORER: LANDSCAPE | $9.45 | $0.49 | $9.94 |
| LABORER: COMMON OR GENERAL | $9.55 | $0.00 | $9.55 |
| HVAC MECHANIC (HVAC DUCT INSTALLATION ONLY) | $19.71 | $1.93 | $21.64 |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK | $15.14 | $3.16 | $18.30 |
| CARPENTER (FORM WORK ONLY) | $13.23 | $0.02 | $13.25 |
| CARPENTER (DRYWALL HANGING ONLY) | $16.32 | $1.50 | $17.82 |
| BRICKLAYER | $18.00 | $0.00 | $18.00 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.