Building construction wages: Spartanburg, South Carolina
Wage determination SC20260029 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/SC20260029 on · latest revision 1 · verify at sam.gov/wage-determination/SC20260029/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN WORK FROM SWINGING SCAFFOLDS, BOSON CHAIRS, OR RAW STRUCTURAL STEEL: $1.00 PER HOUR ADDITIONAL | $32.31 | $13.66 | $45.97 |
| IRONWORKER, STRUCTURAL | $29.75 | $18.00 | $47.75 |
| PIPEFITTER | $36.00 | $14.19 | $50.19 |
| TRUCK DRIVER | $14.05 | $3.18 | $17.23 |
| ROOFER | $12.11 | $0.00 | $12.11 |
| PLUMBER | $19.21 | $4.56 | $23.77 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $12.36 | $0.00 | $12.36 |
| OPERATOR: LOADER | $11.64 | $1.03 | $12.67 |
| OPERATOR: GRADER/BLADE | $17.50 | $1.78 | $19.28 |
| OPERATOR: CRANE | $19.39 | $2.02 | $21.41 |
| OPERATOR: BULLDOZER | $17.07 | $2.65 | $19.72 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.05 | $1.96 | $18.01 |
| LABORER: PIPELAYER | $14.69 | $2.08 | $16.77 |
| LABORER: MASON TENDER-BRICK/CONCRETE/CEMENT/STONE | $10.88 | $0.00 | $10.88 |
| LABORER: LANDSCAPE | $9.45 | $0.49 | $9.94 |
| LABORER: COMMON OR GENERAL | $10.52 | $0.66 | $11.18 |
| HVAC MECHANIC (HVAC DUCT INSTALLATION ONLY) | $19.11 | $0.00 | $19.11 |
| CEMENT MASON/CONCRETE FINISHER | $14.10 | $0.00 | $14.10 |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK | $14.75 | $0.92 | $15.67 |
| CARPENTER (FORM WORK ONLY) | $15.53 | $1.76 | $17.29 |
| CARPENTER (DRYWALL HANGING ONLY) | $16.32 | $1.50 | $17.82 |
| BRICKLAYER | $17.50 | $0.67 | $18.17 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.