Building construction wages: Orangeburg, South Carolina
Wage determination SC20260016 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/SC20260016 on · latest revision 1 · verify at sam.gov/wage-determination/SC20260016/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER | $12.76 | $2.04 | $14.80 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $19.15 | $1.15 | $20.30 |
| PLUMBER | $16.99 | $2.17 | $19.16 |
| PIPEFITTER | $18.95 | $3.39 | $22.34 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $13.50 | $0.00 | $13.50 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.39 | $1.83 | $18.22 |
| LABORER: PIPELAYER | $12.50 | $1.23 | $13.73 |
| LABORER: COMMON OR GENERAL | $10.62 | $0.55 | $11.17 |
| FORM WORKER | $14.08 | $0.00 | $14.08 |
| ELECTRICIAN | $19.99 | $4.04 | $24.03 |
| CARPENTER, EXCLUDES FORM WORK | $15.45 | $0.00 | $15.45 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.