Building construction wages: Darlington, Florence, South Carolina
Wage determination SC20260005 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/SC20260005 on July 24, 2026 · latest revision 1 · verify at sam.gov/wage-determination/SC20260005/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN WORK MORE THAN 40 FT. ABOVE THE GROUND ON OR FROM SWINGING SCAFFOLDS, BOSON CHAIRS, OR RAW STRUCTURAL STEEL: $1.00 PER HOUR ADDITIONAL | $32.80 | $13.99 | $46.79 |
| IRONWORKER, STRUCTURAL | $29.75 | $18.00 | $47.75 |
| PIPEFITTER | $36.00 | $14.19 | $50.19 |
| TRUCK DRIVER | $14.05 | $3.18 | $17.23 |
| ROOFER | $12.21 | $0.00 | $12.21 |
| PLUMBER | $16.86 | $0.95 | $17.81 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $12.00 | $0.00 | $12.00 |
| OPERATOR: LOADER | $14.18 | $1.99 | $16.17 |
| OPERATOR: GRADER/BLADE | $17.50 | $1.78 | $19.28 |
| OPERATOR: CRANE | $19.39 | $2.02 | $21.41 |
| OPERATOR: BULLDOZER | $17.07 | $2.65 | $19.72 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.81 | $2.67 | $19.48 |
| LABORER: PIPELAYER | $14.69 | $2.08 | $16.77 |
| LABORER: MASON TENDER-BRICK/CONCRETE/CEMENT/STONE | $11.00 | $0.00 | $11.00 |
| LABORER: LANDSCAPE | $9.45 | $0.49 | $9.94 |
| LABORER: COMMON OR GENERAL | $10.79 | $1.33 | $12.12 |
| HVAC MECHANIC (HVAC DUCT INSTALLATION ONLY) | $19.71 | $1.93 | $21.64 |
| DRYWALL HANGER | $16.32 | $1.50 | $17.82 |
| CEMENT MASON/CONCRETE FINISHER | $14.63 | $0.00 | $14.63 |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK | $15.14 | $3.16 | $18.30 |
| CARPENTER (FORM WORK ONLY) | $13.23 | $0.02 | $13.25 |
| BRICKLAYER | $18.00 | $0.00 | $18.00 |