Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 5 | 2026-05-18 | diff vs rev 4 |
| rev 4 | 2026-05-17 | diff vs rev 3 |
| rev 3 | 2026-01-30 | diff vs rev 2 |
| rev 2 | 2026-01-23 | diff vs rev 1 |
| rev 1 | 2026-01-16 | diff vs rev 0 |
| rev 0 | 2026-01-09 | original |
Current rates (rev 5)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (MECHANICAL- DUCT, PIPE & MECHANICAL SYSTEM INSULATION AND INDUSTRIAL WORK (INCLUDING DUCT AND PIPE)) | $46.50 | $29.43 | $75.93 |
| BOILERMAKER | $48.28 | $33.17 | $81.45 |
| TILE SETTER | $35.64 | $21.63 | $57.27 |
| TILE FINISHER | $28.76 | $17.16 | $45.92 |
| MASON - STONE ADDITIONAL $0.75 TO THE BASE WAGE FOR BRICK REFRACTORY WORK | $37.00 | $23.82 | $60.82 |
| BRICKLAYER: INCLUDING POINTING, CAULKING, CLEANING AND BRICK REFRACTORY WORK ADDITIONAL $0.75 TO THE BASE WAGE FOR BRICK REFRACTORY WORK | $37.00 | $23.82 | $60.82 |
| CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, METAL STUD INSTALLATION, FLOOR LAYING-HARDWOOD, CARPET AND VINYL; FORM WORK, AND SCAFFOLD BUILDING) | $38.92 | $20.06 | $58.98 |
| PILEDRIVERMAN | $43.13 | $23.42 | $66.55 |
| MILLWRIGHT | $43.00 | $23.44 | $66.44 |
| ELECTRICIAN (ALARM INSTALLATION, INSTALLATION OF SOUND AND COMMUNICATION SYSTEM AND LOW VOLTAGE WIRING, HVAC/TEMPERATURE CONTROLS INSTALLATION ONLY) | $49.11 | $36.79 | $85.90 |
| POWER EQUIPMENT OPERATOR: OILER | $32.83 | $24.05 | $56.88 |
| POWER EQUIPMENT OPERATOR: LOADER | $41.69 | $24.05 | $65.74 |
| POWER EQUIPMENT OPERATOR: BROOM/SWEEPER, COMPRESSOR, CONCRETE PUMP, HIGHLIFT, HOIST, PUMP, ROLLER, TUGBOAT, FORKLIFT (RIDDEN OR SELF-PROPELLED) | $35.62 | $24.05 | $59.67 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID STEER/SKID LOADER, BULLDOZER, COMPACTOR, CRANE*, DRILL RIG CAISSONS, DRILL, GRADALL, GRADER/BLADE, MAN LIFT/OUTSIDE ELEVATOR, MECHANIC, PAVER (ASPHALT, AGGREGATE, AND CONCRETE), SCRAPER, FORKLIFT (LULL) ADD $.75 BOOMS 151-200 JIBS- ADD $1.50 - BOOMS 201-251 JIBS- ADD $2.25 | $41.69 | $24.05 | $65.74 |
| IRONWORKER (METAL ROOF INSTALLATION, ORNAMENTAL, REINFORCING, RIGGER AND STRUCTURAL; METAL BUILDINGS: METAL SIDING/WALL PANELS INSTALLATION) | $38.89 | $34.54 | $73.43 |
| LABORER (MASON TENDER - CEMENT/CONCRETE) | $30.24 | $12.05 | $42.29 |
| LABORER (COMMON OR GENERAL; MASON TENDER- BRICK) | $22.17 | $13.65 | $35.82 |
| LABORER (ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, AND CEILINGS)) | $27.97 | $20.39 | $48.36 |
| PAINTER: DRYWALL FINISHING/TAPING | $32.39 | $23.26 | $55.65 |
| PAINTER (BRUSH, ROLLER, AND SPRAY, EXCLUDING WORK ON INDUSTRIAL SITES) | $30.56 | $23.72 | $54.28 |
| PAINTER (INDUSTRIAL: SPRAY AND SANDBLASTER ONLY) | $36.01 | $23.72 | $59.73 |
| PAINTER (INDUSTRIAL: BRUSH AND ROLLER ONLY) | $36.01 | $23.72 | $59.73 |
| GLAZIER | $35.65 | $29.73 | $65.38 |
| CEMENT MASON/CONCRETE FINISHER | $31.77 | $21.89 | $53.66 |
| PLASTERER | $30.69 | $18.99 | $49.68 |
| PLUMBER | $48.65 | $25.47 | $74.12 |
| PIPEFITTER (INDUSTRIAL) | $47.75 | $26.55 | $74.30 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION, EXCLUDES WORK ON INDUSTRIAL SITES) | $48.15 | $29.17 | $77.32 |
| ROOFER (INCLUDES WATERPROOFING, EXCLUDES METAL ROOF INSTALLATION) | $41.21 | $21.46 | $62.67 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $45.08 | $26.16 | $71.24 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $39.50 | $30.79 | $70.29 |
| TRUCK DRIVER: DUMP TRUCK | $23.36 | $7.60 | $30.96 |
| LABORER: LUTEMAN | $21.13 | $8.23 | $29.36 |
| LABORER: LANDSCAPE | $18.10 | $0.00 | $18.10 |
| LABORER: ASPHALT RAKER | $20.92 | $9.09 | $30.01 |