Current rates (rev 3)
The CSV and the printed sheet are snapshots of rev 3. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (MECHANICAL- DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $39.18 | $26.07 | $65.25 |
| BOILERMAKER | $55.00 | $35.48 | $90.48 |
| TILE SETTER | $32.92 | $19.31 | $52.23 |
| TILE FINISHER | $30.20 | $16.41 | $46.61 |
| CARPENTER (INCLUDING DRYWALL HANGING, METAL STUD INSTALLATION, AND FORM WORK) | $36.57 | $20.04 | $56.61 |
| ELECTRICIAN (EXCLUDES ALARM INSTALLATION, INSTALLATION OF SOUND AND COMMUNICATION SYSTEMS, HVAC/TEMPERATURE CONTROL INSTALLATION AND LOW VOLTAGE WIRING) | $65.43 | $42.20 | $107.63 |
| ELEVATOR MECHANIC | $61.41 | $38.44 | $99.85 |
| POWER EQUIPMENT OPERATOR (PUMP) | $28.36 | $18.10 | $46.46 |
| POWER EQUIPMENT OPERATOR (OILER) | $39.42 | $29.30 | $68.72 |
| POWER EQUIPMENT OPERATOR (HOIST (SINGLE DRUM), FORKLIFT (UNDER 20 FT, EXCLUDES MASONRY WORK)) | $41.88 | $30.03 | $71.91 |
| POWER EQUIPMENT OPERATOR (BACKHOE/ EXCAVATOR/ TRACKHOE, BOBCAT/ SKID/ STEER/ SKID LOADER, BULLDOZER, HOIST (WITH TWO TOWERS), MECHANIC, LOADER, FORKLIFT (20 FT AND OVER, EXCLUDES MASONRY WORK)) | $44.61 | $30.83 | $75.44 |
| IRONWORKER (ORNAMENTAL, STRUCTURAL, REINFORCING, & RIGGER) | $37.26 | $32.63 | $69.89 |
| LABORER: MASON TENDER-BRICK | $26.74 | $17.34 | $44.08 |
| LABORER (COMMON OR GENERAL; CONCRETE WORKER; TAMPER (HAND HELD)) | $25.39 | $17.34 | $42.73 |
| PAINTER (BRUSH, ROLLER, SPRAY, AND DRYWALL FINISHING/TAPING) | $27.95 | $16.12 | $44.07 |
| PLUMBER | $51.69 | $27.07 | $78.76 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) | $51.69 | $27.07 | $78.76 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $49.75 | $30.26 | $80.01 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT AND METAL ROOF INSTALLATION) | $36.13 | $30.32 | $66.45 |
| TRUCK DRIVER: DUMP TRUCK | $23.36 | $7.60 | $30.96 |
| ROOFER: WATERPROOFING ONLY | $28.60 | $18.02 | $46.62 |
| ROOFER, EXCLUDES METAL ROOF INSTALLATION AND WATERPROOFING | $26.56 | $17.98 | $44.54 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $33.01 | $18.37 | $51.38 |
| OPERATOR: GRADER/BLADE | $32.51 | $17.98 | $50.49 |
| OPERATOR: GRADALL | $32.70 | $18.43 | $51.13 |
| OPERATOR: DRILL | $28.55 | $15.78 | $44.33 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $48.28 | $24.74 | $73.02 |
| ELECTRICIAN (INSTALLATION OF SOUND AND COMMUNICATION SYSTEMS ONLY) | $48.28 | $24.74 | $73.02 |
| ELECTRICIAN (ALARM INSTALLATION ONLY) | $48.28 | $24.74 | $73.02 |
| CEMENT MASON/CONCRETE FINISHER | $24.97 | $16.60 | $41.57 |
| BRICKLAYER | $30.34 | $13.97 | $44.31 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $27.89 | $19.81 | $47.70 |
| ELECTRICIAN (HVAC/TEMPERATURE CONTROLS INSTALLATION ONLY) | $55.63 | $30.87 | $86.50 |
| OPERATOR: CRANE | $44.13 | $29.82 | $73.95 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.