Building construction wages: Mercer, Pennsylvania
Wage determination PA20260097 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/PA20260097 on · latest revision 6 · verify at sam.gov/wage-determination/PA20260097/6
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 6 | 2026-08-20 | diff vs rev 5 |
| rev 5 | 2026-05-18 | diff vs rev 4 |
| rev 4 | 2026-05-17 | diff vs rev 3 |
| rev 3 | 2026-01-30 | diff vs rev 2 |
| rev 2 | 2026-01-23 | diff vs rev 1 |
| rev 1 | 2026-01-16 | diff vs rev 0 |
| rev 0 | 2026-01-09 | original |
Current rates (rev 6)
The CSV and the printed sheet are snapshots of rev 6. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $48.28 | $33.17 | $81.45 |
| TILE FINISHER | $28.76 | $17.16 | $45.92 |
| TILE SETTER | $35.64 | $21.63 | $57.27 |
| BRICKLAYER (INCLUDING POINTING, CAULKING, AND CLEANING) | $34.73 | $24.14 | $58.87 |
| MASON - STONE | $34.73 | $24.14 | $58.87 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION, FLOOR LAYING-CARPET AND VINYL ONLY) | $35.94 | $19.02 | $54.96 |
| CARPENTER (INCLUDING DRYWALL HANGING, METAL STUD INSTALLATION, AND FORM WORK; EXCLUDES FLOOR LAYING- CARPET, VINYL; AND ACOUSTICAL CEILING INSTALLATION) | $35.94 | $19.02 | $54.96 |
| PILEDRIVERMAN | $43.13 | $23.42 | $66.55 |
| MILLWRIGHT | $43.00 | $23.44 | $66.44 |
| ELECTRICIAN (INCLUDING ALARM INSTALLATION AND LOW VOLTAGE WIRING) | $51.45 | $29.77 | $81.22 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BULLDOZER, COMPACTOR, CRANE*, DRILL, GRADALL, GRADER/BLADE, MECHANIC, FORKLIFT( LULL) | $41.69 | $24.05 | $65.74 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKIDSTEER/SKID LOADER, DRILL RIG CAISSON, HIGHLIFT, PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $41.69 | $24.05 | $65.74 |
| POWER EQUIPMENT OPERATOR: HOIST, PUMP, FORKLIFT (RIDDEN OR SELF-PROPELLED) BACKHOE/EXCAVATOR/TRACKHOE, BULLDOZER, COMPACTOR, CRANE*, DRILL, GRADALL, GRADER/BLADE, MECHANIC, FORKLIFT( LULL), ROLLER | $35.62 | $24.05 | $59.67 |
| POWER EQUIPMENT OPERATOR: LOADER | $41.69 | $24.05 | $65.74 |
| POWER EQUIPMENT OPERATOR: OILER | $32.83 | $24.05 | $56.88 |
| IRONWORKER (METAL BUILDINGS: METAL SIDING/WALL PANELS INSTALLATION ONLY) | $33.57 | $32.23 | $65.80 |
| IRONWORKER (ORNAMENTAL, REINFORCING, RIGGER AND STRUCTURAL) | $36.26 | $28.16 | $64.42 |
| LABORER (MASON TENDER - CEMENT/CONCRETE) | $30.24 | $12.05 | $42.29 |
| LABORER: COMMON OR GENERAL | $22.73 | $18.97 | $41.70 |
| LABORER: MASON TENDER-BRICK | $22.88 | $18.97 | $41.85 |
| PAINTER: BRUSH AND ROLLER ONLY | $30.56 | $23.72 | $54.28 |
| PAINTER: DRYWALL FINISHING/TAPING ONLY | $32.39 | $23.26 | $55.65 |
| PAINTER: SPRAY ONLY | $27.12 | $24.89 | $52.01 |
| GLAZIER | $25.40 | $25.47 | $50.87 |
| CEMENT MASON/CONCRETE FINISHER | $31.77 | $21.89 | $53.66 |
| PLUMBER | $46.98 | $25.47 | $72.45 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) | $48.15 | $29.17 | $77.32 |
| ROOFER (EXCLUDES METAL ROOF INSTALLATION AND WATERPROOFING) | $36.70 | $18.09 | $54.79 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $49.75 | $30.26 | $80.01 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT AND METAL FLASHING INSTALLATION) | $46.75 | $35.93 | $82.68 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $30.55 | $20.04 | $50.59 |
| ROOFER: WATERPROOFING ONLY | $26.77 | $12.57 | $39.34 |
| TRUCK DRIVER: DUMP TRUCK | $23.36 | $7.60 | $30.96 |
| IRONWORKER (METAL ROOF INSTALLATION ONLY) | $36.72 | $30.38 | $67.10 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.