Building construction wages: Lebanon, Pennsylvania
Wage determination PA20260093 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/PA20260093 on · latest revision 2 · verify at sam.gov/wage-determination/PA20260093/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-09 | original |
Current rates (rev 2)
The CSV and the printed sheet are snapshots of rev 2. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) (ASBESTOS ABATEMENT, REMOVAL FROM MECHANICAL SYSTEMS ONLY) | $40.00 | $29.81 | $69.81 |
| BOILERMAKER | $55.00 | $35.48 | $90.48 |
| PILEDRIVERMAN | $36.87 | $20.49 | $57.36 |
| CARPENTER (SCAFFOLD BUILDING AND FORM WORK ONLY) | $36.84 | $20.19 | $57.03 |
| MILLWRIGHT | $43.00 | $23.44 | $66.44 |
| ELECTRICIAN (INCLUDES HVAC/TEMPERATURE CONTROLS INSTALLATION, AND LOW VOLTAGE WIRING; EXCLUDES INSTALLATION OF SOUND AND COMMUNICATION SYSTEMS AND ALARM INSTALLATION) | $40.00 | $27.42 | $67.42 |
| ELECTRICIAN (ALARM INSTALLATION ONLY) | $40.31 | $23.93 | $64.24 |
| ELECTRICIAN (INSTALLATION OF COMMUNICATION AND SOUND SYSTEMS ONLY) | $34.77 | $20.19 | $54.96 |
| ELEVATOR MECHANIC | $58.70 | $38.44 | $97.14 |
| POWER EQUIPMENT OPERATOR (PUMP) | $32.25 | $21.32 | $53.57 |
| POWER EQUIPMENT OPERATOR (MECHANIC) | $36.87 | $21.32 | $58.19 |
| POWER EQUIPMENT OPERATOR: CRANE | $47.14 | $31.58 | $78.72 |
| POWER EQUIPMENT OPERATOR (OILER) | $39.42 | $29.30 | $68.72 |
| POWER EQUIPMENT OPERATOR (HOIST (WITH TWO TOWERS), FORKLIFT (20 FT AND OVER, EXCLUDES MASONRY WORK)) | $44.61 | $30.83 | $75.44 |
| POWER EQUIPMENT OPERATOR (HOIST (SINGLE DRUM), FORKLIFT (UNDER 20 FT., EXCLUDES MASONRY WORK)) | $41.88 | $30.03 | $71.91 |
| IRONWORKER: ORNAMENTAL AND STRUCTURAL | $37.26 | $32.63 | $69.89 |
| LABORER (ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, AND CEILINGS)) | $27.47 | $19.89 | $47.36 |
| LABORER (JACK HAMMER; MASON TENDER-BRICK) | $27.02 | $19.48 | $46.50 |
| LABORER (FORKLIFT (MASONRY WORK ONLY)) | $28.52 | $19.48 | $48.00 |
| LABORER (CONCRETE WORKER; CONCRETE SAW (WALK BEHIND/HAND HELD)) | $25.01 | $19.48 | $44.49 |
| PAINTER (SPRAY ONLY) | $26.98 | $15.65 | $42.63 |
| PAINTER: BRUSH AND ROLLER ONLY | $25.84 | $16.30 | $42.14 |
| PLUMBER | $41.36 | $29.45 | $70.81 |
| PIPEFITTER (INCLUDES HVAC UNIT INSTALLATION, EXCLUDES HVAC PIPE INSTALLATION) | $41.36 | $29.45 | $70.81 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $49.75 | $28.96 | $78.71 |
| SHEET METAL WORKER: EXCLUDING HVAC DUCT INSTALLATION | $43.09 | $42.52 | $85.61 |
| TRUCK DRIVER: DUMP TRUCK | $19.77 | $5.02 | $24.79 |
| TILE SETTER | $24.31 | $11.62 | $35.93 |
| TILE FINISHER | $20.65 | $8.24 | $28.89 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $29.56 | $19.21 | $48.77 |
| ROOFER: WATERPROOFING ONLY | $28.60 | $18.02 | $46.62 |
| ROOFER, EXCLUDES WATERPROOFING | $17.00 | $2.78 | $19.78 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $47.38 | $6.89 | $54.27 |
| OPERATOR: ROLLER | $30.39 | $13.72 | $44.11 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $30.39 | $15.05 | $45.44 |
| OPERATOR: LOADER | $27.05 | $14.52 | $41.57 |
| OPERATOR: GRADER/BLADE | $32.51 | $17.98 | $50.49 |
| OPERATOR: GRADALL | $32.70 | $18.43 | $51.13 |
| OPERATOR: DRILL | $25.58 | $17.07 | $42.65 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $24.14 | $13.55 | $37.69 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $31.05 | $10.85 | $41.90 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $26.17 | $4.88 | $31.05 |
| LABORER: LANDSCAPE | $15.01 | $0.00 | $15.01 |
| LABORER: COMMON OR GENERAL | $19.70 | $7.14 | $26.84 |
| IRONWORKER, REINFORCING | $28.97 | $6.47 | $35.44 |
| GLAZIER | $20.19 | $6.92 | $27.11 |
| FLOOR LAYER: VINYL FLOORING ONLY | $19.71 | $5.94 | $25.65 |
| FLOOR LAYER: HARDWOOD FLOORS ONLY | $26.91 | $11.88 | $38.79 |
| FLOOR LAYER: CARPET ONLY | $18.78 | $5.02 | $23.80 |
| CEMENT MASON/CONCRETE FINISHER | $27.76 | $8.21 | $35.97 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING AND METAL STUD INSTALLATION, FORM WORK, AND SCAFFOLD BUILDING | $25.93 | $11.29 | $37.22 |
| CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | $24.18 | $12.02 | $36.20 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $37.73 | $4.59 | $42.32 |
| BRICKLAYER, INCLUDES POINTING, CAULKING, AND CLEANING | $28.56 | $11.56 | $40.12 |
| OPERATOR: BULLDOZER | $37.85 | $22.72 | $60.57 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.