Building construction wages: Cumberland, Pennsylvania
Wage determination PA20260085 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/PA20260085 on · latest revision 2 · verify at sam.gov/wage-determination/PA20260085/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-09 | original |
Current rates (rev 2)
The CSV and the printed sheet are snapshots of rev 2. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $40.00 | $29.81 | $69.81 |
| BOILERMAKER | $55.00 | $35.48 | $90.48 |
| BRICKLAYER (INCLUDING POINTING, CAULKING, AND CLEANING) | $33.99 | $16.87 | $50.86 |
| CARPENTER (DRYWALL HANGING, METAL STUD INSTALLATION, FORM WORK AND SCAFFOLD BUILDING ONLY) | $36.84 | $20.19 | $57.03 |
| MILLWRIGHT | $43.00 | $23.44 | $66.44 |
| ELECTRICIAN (INCLUDES ALARM INSTALLATION, INSTALLATION OF SOUND AND COMMUNICATION SYSTEMS, HVAC/TEMPERATURE CONTROLS INSTALLATION, AND LOW VOLTAGE WIRING) | $40.00 | $27.42 | $67.42 |
| ELEVATOR MECHANIC | $58.70 | $38.44 | $97.14 |
| POWER EQUIPMENT OPERATOR (PUMP) | $32.25 | $21.32 | $53.57 |
| POWER EQUIPMENT OPERATOR (MECHANIC) | $36.87 | $21.32 | $58.19 |
| POWER EQUIPMENT OPERATOR: CRANE | $47.14 | $31.58 | $78.72 |
| POWER EQUIPMENT OPERATOR (OILER) | $39.42 | $29.30 | $68.72 |
| POWER EQUIPMENT OPERATOR (HOIST (WITH TWO TOWERS), FORKLIFT (20 FT AND OVER, EXCLUDES MASONRY WORK)) | $44.61 | $30.83 | $75.44 |
| POWER EQUIPMENT OPERATOR (HOIST (SINGLE DRUM), FORKLIFT (UNDER 20 FT., EXCLUDES MASONRY WORK)) | $41.88 | $30.03 | $71.91 |
| IRONWORKER: ORNAMENTAL | $37.26 | $32.63 | $69.89 |
| LABORER: MASON TENDER-BRICK | $24.31 | $13.33 | $37.64 |
| LABORER: CONCRETE WORKER | $22.86 | $13.33 | $36.19 |
| LABORER (FORKLIFT (MASONRY WORK ONLY)) | $25.81 | $13.33 | $39.14 |
| PAINTER: BRUSH AND ROLLER ONLY | $25.84 | $16.30 | $42.14 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) | $41.36 | $29.45 | $70.81 |
| PLUMBER (EXCLUDES HVAC UNIT INSTALLATION) | $41.36 | $29.45 | $70.81 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $49.75 | $28.96 | $78.71 |
| SHEET METAL WORKER: HVAC DUCT INSTALLATION ONLY | $45.02 | $44.09 | $89.11 |
| TRUCK DRIVER: DUMP TRUCK | $20.86 | $4.84 | $25.70 |
| TILE SETTER | $24.30 | $11.79 | $36.09 |
| TILE FINISHER | $20.70 | $8.51 | $29.21 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $28.98 | $27.03 | $56.01 |
| ROOFER: WATERPROOFING ONLY | $28.60 | $18.02 | $46.62 |
| ROOFER, EXCLUDES WATERPROOFING | $31.00 | $22.10 | $53.10 |
| PLUMBER (HVAC UNIT INSTALLATION ONLY) | $26.67 | $15.99 | $42.66 |
| PAINTER: SPRAY ONLY | $27.89 | $13.53 | $41.42 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $30.39 | $15.05 | $45.44 |
| OPERATOR: LOADER | $27.05 | $14.52 | $41.57 |
| OPERATOR: HYDRO MULCH | $26.41 | $16.58 | $42.99 |
| OPERATOR: GRADER/BLADE | $32.51 | $17.98 | $50.49 |
| OPERATOR: GRADALL | $32.70 | $18.43 | $51.13 |
| OPERATOR: DRILL | $27.43 | $16.94 | $44.37 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $26.41 | $16.58 | $42.99 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $36.16 | $16.15 | $52.31 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $21.99 | $8.28 | $30.27 |
| LABORER: COMMON/GENERAL, INCLUDING LANDSCAPING | $20.16 | $8.91 | $29.07 |
| IRONWORKER, STRUCTURAL | $25.96 | $21.20 | $47.16 |
| IRONWORKER, REINFORCING | $27.42 | $22.45 | $49.87 |
| GLAZIER | $25.05 | $8.58 | $33.63 |
| FLOOR LAYER: CARPET ONLY | $25.71 | $12.02 | $37.73 |
| CEMENT MASON/CONCRETE FINISHER | $24.10 | $15.60 | $39.70 |
| CARPENTER, EXCLUDES DRYWALL HANGING AND METAL STUD INSTALLATION, FORM WORK, AND SCAFFOLD BUILDING | $25.71 | $10.62 | $36.33 |
| OPERATOR: BULLDOZER | $37.85 | $22.72 | $60.57 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.