Building construction wages: Columbia, Pennsylvania
Wage determination PA20260084 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/PA20260084 on · latest revision 2 · verify at sam.gov/wage-determination/PA20260084/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-09 | original |
Current rates (rev 2)
The CSV and the printed sheet are snapshots of rev 2. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (MECHANICAL- DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $39.18 | $26.07 | $65.25 |
| BOILERMAKER | $55.00 | $35.48 | $90.48 |
| MASON - STONE | $32.66 | $21.58 | $54.24 |
| BRICKLAYER (INCLUDING POINTING, CAULKING, AND CLEANING) | $32.66 | $21.58 | $54.24 |
| TILE FINISHER | $27.63 | $13.94 | $41.57 |
| TILE SETTER | $32.85 | $17.56 | $50.41 |
| CARPENTER (ACOUSTICAL CEILING INSTALLER ONLY) | $36.84 | $20.19 | $57.03 |
| CARPENTER (INCLUDING DRYWALL HANGING, METAL STUD INSTALLATION, FORM WORK AND SCAFFOLD BUILDING) | $36.84 | $20.19 | $57.03 |
| MILLWRIGHT | $43.00 | $23.44 | $66.44 |
| ELECTRICIAN (ALARM INSTALLATION, HVAC/TEMPERATURE CONTROLS INSTALLATION AND LOW VOLTAGE WIRING ONLY) | $41.00 | $31.06 | $72.06 |
| ELEVATOR MECHANIC | $61.41 | $38.44 | $99.85 |
| POWER EQUIPMENT OPERATOR (PUMP) | $28.36 | $18.10 | $46.46 |
| POWER EQUIPMENT OPERATOR (6) OILER | $39.42 | $29.30 | $68.72 |
| POWER EQUIPMENT OPERATOR (4) PUMP | $40.74 | $29.70 | $70.44 |
| POWER EQUIPMENT OPERATOR (3) HOIST (SINGLE DRUM), FORKLIFT (UNDER 20 FT) | $41.88 | $30.03 | $71.91 |
| POWER EQUIPMENT OPERATOR (2) BOBCAT/ SKID/ STEER/ SKID LOADER, BULLDOZER, HOIST (WITH TWO TOWERS), MECHANIC, LOADER, FORKLIFT (20 FT. AND OVER) | $44.61 | $30.83 | $75.44 |
| POWER EQUIPMENT OPERATOR (1A) CRANE | $47.14 | $31.58 | $78.72 |
| IRONWORKER (ORNAMENTAL, STRUCTURAL, & REINFORCING) | $37.26 | $32.63 | $69.89 |
| LABORER: COMMON OR GENERAL | $21.02 | $16.88 | $37.90 |
| LABORER (MASON TENDER- BRICK) | $23.41 | $11.19 | $34.60 |
| LABORER (FORKLIFT (MASONRY WORK ONLY)) | $24.91 | $11.19 | $36.10 |
| LABORER (CONCRETE WORKER; CONCRETE SAW (WALK BEHIND/HAND HELD)) | $20.07 | $11.19 | $31.26 |
| PAINTER (BRUSH, ROLLER, SPRAY, AND DRYWALL FINISHING/TAPING) | $27.95 | $16.12 | $44.07 |
| PLUMBER | $41.36 | $29.45 | $70.81 |
| PIPEFITTER (INCLUDES HVAC PIPE AND HVAC UNIT INSTALLATION) | $41.36 | $29.45 | $70.81 |
| ROOFER (EXCLUDES WATERPROOFING) | $40.33 | $32.62 | $72.95 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $49.75 | $28.96 | $78.71 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT AND SIDING INSTALLATION - METAL/ALUMINUM/VINYL) | $36.13 | $30.32 | $66.45 |
| TRUCK DRIVER: DUMP TRUCK | $23.36 | $7.60 | $30.96 |
| ROOFER: WATERPROOFING ONLY | $28.60 | $18.02 | $46.62 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $33.01 | $18.37 | $51.38 |
| OPERATOR: GRADER/BLADE | $32.51 | $17.98 | $50.49 |
| OPERATOR: GRADALL | $32.70 | $18.43 | $51.13 |
| OPERATOR: DRILL | $28.55 | $15.78 | $44.33 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $30.73 | $15.10 | $45.83 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $27.89 | $19.81 | $47.70 |
| CEMENT MASON/CONCRETE FINISHER | $32.66 | $21.32 | $53.98 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.