Building construction wages: Centre, Pennsylvania
Wage determination PA20260082 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/PA20260082 on · latest revision 3 · verify at sam.gov/wage-determination/PA20260082/3
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 3 | 2026-09-24 | diff vs rev 2 |
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-09 | original |
Current rates (rev 3)
The CSV and the printed sheet are snapshots of rev 3. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $43.00 | $29.81 | $72.81 |
| BOILERMAKER | $48.28 | $33.17 | $81.45 |
| BRICKLAYER (INCLUDING POINTING, CAULKING, AND CLEANING) | $31.35 | $13.85 | $45.20 |
| MASON - STONE | $31.35 | $13.85 | $45.20 |
| TILE FINISHER | $28.76 | $17.16 | $45.92 |
| TILE SETTER | $35.64 | $21.63 | $57.27 |
| CARPENTER (SCAFFOLD BUILDING AND FLOOR LAYING-HARDWOOD ONLY) | $33.01 | $18.09 | $51.10 |
| CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, METAL STUD INSTALLATION, FLOOR LAYING-CARPET AND VINYL, FORM WORK AND GUTTER INSTALLATION; EXCLUDES SCAFFOLD BUILDING AND FLOOR LAYING-HARDWOOD FLOORS.) | $33.01 | $18.09 | $51.10 |
| MILLWRIGHT | $49.00 | $26.29 | $75.29 |
| ELECTRICIAN (INCLUDES ALARM INSTALLATION, INSTALLATION OF SOUND AND COMMUNICATION SYSTEM AND LOW VOLTAGE WIRING; EXCLUDES HVAC TEMPERATURE CONTROL INSTALLATION) | $50.86 | $31.78 | $82.64 |
| ELECTRICIAN (HVAC/TEMPERATURE CONTROLS INSTALLATION ONLY) | $40.00 | $27.42 | $67.42 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BULLDOZER, CRANE* LOADER, MECHANIC) | $36.87 | $21.32 | $58.19 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER, DRILL, GRADALL, GRADER/BLADE, PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $36.87 | $21.32 | $58.19 |
| POWER EQUIPMENT OPERATOR: HOIST, PUMP | $29.70 | $21.32 | $51.02 |
| POWER EQUIPMENT OPERATOR: OILER | $29.70 | $21.32 | $51.02 |
| POWER EQUIPMENT OPERATOR: ROLLER | $32.25 | $21.32 | $53.57 |
| IRONWORKER: ORNAMENTAL, REINFORCING, RIGGER, AND STRUCTURAL | $32.29 | $32.41 | $64.70 |
| LABORER (MASON TENDER - CEMENT/CONCRETE) | $30.24 | $12.05 | $42.29 |
| LABORER: MASON TENDER-BRICK | $29.56 | $17.05 | $46.61 |
| PAINTER (DRYWALL FINISHING/TAPING ONLY) | $32.39 | $23.26 | $55.65 |
| PAINTER: BRUSH, ROLLER, AND SPRAY ONLY | $30.56 | $23.72 | $54.28 |
| GLAZIER | $25.40 | $25.47 | $50.87 |
| PLASTERER | $29.20 | $12.86 | $42.06 |
| PLUMBER (INDUSTRIAL) | $47.75 | $26.55 | $74.30 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) | $41.36 | $29.45 | $70.81 |
| PLUMBER (EXCLUDES WORK ON INDUSTRIAL SITES) | $41.36 | $29.45 | $70.81 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $49.75 | $28.96 | $78.71 |
| SHEET METAL WORKER: HVAC DUCT INSTALLATION ONLY | $45.02 | $44.09 | $89.11 |
| CEMENT MASON/CONCRETE FINISHER | $26.02 | $13.86 | $39.88 |
| LABORER: COMMON OR GENERAL | $18.55 | $9.67 | $28.22 |
| OPERATOR: FORKLIFT, ALL TYPES | $23.69 | $13.13 | $36.82 |
| ROOFER, EXCLUDES WATERPROOFING | $33.50 | $22.10 | $55.60 |
| ROOFER: WATERPROOFING ONLY | $29.50 | $21.10 | $50.60 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $32.03 | $22.87 | $54.90 |
| TRUCK DRIVER: DUMP TRUCK | $23.36 | $7.60 | $30.96 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.