Current rates (rev 4)
The CSV and the printed sheet are snapshots of rev 4. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $40.00 | $29.81 | $69.81 |
| BOILERMAKER | $48.28 | $33.17 | $81.45 |
| TILE FINISHER | $28.76 | $17.16 | $45.92 |
| TILE SETTER | $35.64 | $21.63 | $57.27 |
| BRICKLAYER (INCLUDING POINTING, CAULKING, CLEANING) | $34.14 | $22.00 | $56.14 |
| MASON - STONE | $34.14 | $22.00 | $56.14 |
| CARPENTER (SCAFFOLD BUILDING AND FLOOR LAYING-HARDWOOD ONLY) | $33.01 | $18.09 | $51.10 |
| CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, METAL STUD INSTALLATION, FLOOR LAYING-CARPET AND VINYL, FORM WORK AND GUTTER INSTALLATION; EXCLUDES SCAFFOLD BUILDING AND FLOOR LAYING-HARDWOOD FLOORS.) | $33.01 | $18.09 | $51.10 |
| MILLWRIGHT | $43.00 | $23.44 | $66.44 |
| ELECTRICIAN (INCLUDES ALARM INSTALLATION, INSTALLATION OF SOUND AND COMMUNICATION SYSTEM AND LOW VOLTAGE WIRING; EXCLUDES HVAC TEMPERATURE CONTROL INSTALLATION) | $49.11 | $36.79 | $85.90 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BULLDOZER, CRANE* LOADER, MECHANIC) | $36.87 | $21.32 | $58.19 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER, DRILL, GRADALL, GRADER/BLADE, PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $36.87 | $21.32 | $58.19 |
| POWER EQUIPMENT OPERATOR: HOIST, PUMP | $29.70 | $21.32 | $51.02 |
| POWER EQUIPMENT OPERATOR: OILER | $29.70 | $21.32 | $51.02 |
| POWER EQUIPMENT OPERATOR: ROLLER | $32.25 | $21.32 | $53.57 |
| IRONWORKER (ORNAMENTAL, REINFORCING, RIGGER, STRUCTURAL) | $38.89 | $34.54 | $73.43 |
| LABORER (MASON TENDER - CEMENT/CONCRETE) | $30.24 | $12.05 | $42.29 |
| LABORER: MASON TENDER-BRICK | $29.56 | $17.05 | $46.61 |
| PAINTER (DRYWALL FINISHING/TAPING ONLY) | $32.39 | $23.26 | $55.65 |
| PAINTER: BRUSH, ROLLER, AND SPRAY ONLY | $30.56 | $23.72 | $54.28 |
| GLAZIER | $25.40 | $25.47 | $50.87 |
| CEMENT MASON/CONCRETE FINISHER | $31.77 | $21.89 | $53.66 |
| PLASTERER | $29.20 | $12.86 | $42.06 |
| PLUMBER (INDUSTRIAL) | $47.75 | $26.55 | $74.30 |
| PIPEFITTER | $41.36 | $29.45 | $70.81 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $46.75 | $35.93 | $82.68 |
| ELECTRICIAN (HVAC/TEMPERATURE CONTROLS INSTALLATION ONLY) | $34.86 | $18.55 | $53.41 |
| LABORER: COMMON OR GENERAL | $17.53 | $10.02 | $27.55 |
| OPERATOR: FORKLIFT, ALL TYPES | $23.69 | $13.13 | $36.82 |
| PLUMBER (HVAC PIPE INSTALLATION ONLY) | $30.44 | $18.73 | $49.17 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION AND WORK ON INDUSTRIAL SITES | $30.14 | $18.83 | $48.97 |
| ROOFER, EXCLUDES WATERPROOFING | $33.50 | $20.66 | $54.16 |
| ROOFER: WATERPROOFING ONLY | $29.50 | $21.10 | $50.60 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $31.38 | $19.73 | $51.11 |
| TRUCK DRIVER: DUMP TRUCK | $23.36 | $7.60 | $30.96 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $47.42 | $28.21 | $75.63 |