Building construction wages: Blair, Pennsylvania
Wage determination PA20260077 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/PA20260077 on · latest revision 2 · verify at sam.gov/wage-determination/PA20260077/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-09 | original |
Current rates (rev 2)
The CSV and the printed sheet are snapshots of rev 2. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $40.00 | $29.81 | $69.81 |
| BOILERMAKER | $48.28 | $33.17 | $81.45 |
| TILE SETTER | $35.64 | $21.63 | $57.27 |
| TILE FINISHER | $28.76 | $17.16 | $45.92 |
| MASON - STONE | $34.14 | $22.00 | $56.14 |
| BRICKLAYER (INCLUDING POINTING, CAULKING, CLEANING) | $34.14 | $22.00 | $56.14 |
| CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION,BATT INSULATION,DRYWALL HANGING,METAL STUD INSTALLATION,FLOOR LAYING-CARPET AND VINYL,FORM WORK AND GUTTER INSTALLATION;SCAFFOLD BUILDING AND FLOOR LAYING-HARDWOOD FLOORS.) | $33.01 | $18.09 | $51.10 |
| MILLWRIGHT | $43.00 | $23.44 | $66.44 |
| ELECTRICIAN (INCLUDES ALARM INSTALLATION, INSTALLATION OF SOUND AND COMMUNICATION SYSTEM, LOW VOLTAGE WIRING AND HVAC TEMPERATURE CONTROL INSTALLATION) | $50.86 | $31.78 | $82.64 |
| POWER EQUIPMENT OPERATOR: ROLLER | $32.25 | $21.32 | $53.57 |
| POWER EQUIPMENT OPERATOR: OILER | $29.70 | $21.32 | $51.02 |
| POWER EQUIPMENT OPERATOR: HOIST, PUMP | $29.70 | $21.32 | $51.02 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER, DRILL, GRADALL, GRADER/BLADE, PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $36.87 | $21.32 | $58.19 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BULLDOZER, CRANE* LOADER, MECHANIC) | $36.87 | $21.32 | $58.19 |
| IRONWORKER: ORNAMENTAL, REINFORCING, RIGGER, AND STRUCTURAL | $32.29 | $32.41 | $64.70 |
| LABORER (MASON TENDER - CEMENT/CONCRETE) | $30.24 | $12.05 | $42.29 |
| LABORER: MASON TENDER-BRICK | $29.56 | $17.05 | $46.61 |
| PAINTER: BRUSH, ROLLER, AND SPRAY ONLY | $30.56 | $23.72 | $54.28 |
| PAINTER (DRYWALL FINISHING/TAPING ONLY) | $32.39 | $23.26 | $55.65 |
| GLAZIER | $25.40 | $25.47 | $50.87 |
| CEMENT MASON/CONCRETE FINISHER | $31.97 | $21.35 | $53.32 |
| PLASTERER | $29.20 | $12.86 | $42.06 |
| PLUMBER (INDUSTRIAL) | $47.75 | $26.55 | $74.30 |
| PLUMBER (EXCLUDES WORK ON INDUSTRIAL SITES) | $40.02 | $26.55 | $66.57 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) | $41.36 | $29.45 | $70.81 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $49.75 | $28.96 | $78.71 |
| SHEET METAL WORKER: HVAC DUCT INSTALLATION ONLY | $45.02 | $44.09 | $89.11 |
| TRUCK DRIVER: DUMP TRUCK | $23.36 | $7.60 | $30.96 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $32.03 | $22.87 | $54.90 |
| ROOFER: WATERPROOFING ONLY | $29.50 | $21.10 | $50.60 |
| ROOFER, EXCLUDES WATERPROOFING | $33.50 | $20.66 | $54.16 |
| OPERATOR: FORKLIFT, ALL TYPES | $23.69 | $13.13 | $36.82 |
| LABORER: COMMON OR GENERAL | $18.15 | $9.76 | $27.91 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.