Wage determination PA20260075 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/PA20260075 on · latest revision 5 · verify at sam.gov/wage-determination/PA20260075/5
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 5 | 2026-08-20 | diff vs rev 4 |
| rev 4 | 2026-05-18 | diff vs rev 3 |
| rev 3 | 2026-05-17 | diff vs rev 2 |
| rev 2 | 2026-01-30 | diff vs rev 1 |
| rev 1 | 2026-01-23 | diff vs rev 0 |
| rev 0 | 2026-01-09 | original |
Current rates (rev 5)
The CSV and the printed sheet are snapshots of rev 5. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (MECHANICAL- DUCT, PIPE & MECHANICAL SYSTEM INSULATION AND INDUSTRIAL WORK (INCLUDING DUCT AND PIPE)) | $46.50 | $29.43 | $75.93 |
| BOILERMAKER | $48.28 | $33.17 | $81.45 |
| TILE FINISHER | $28.76 | $17.16 | $45.92 |
| TILE SETTER | $35.64 | $21.63 | $57.27 |
| BRICKLAYER: INCLUDING POINTING, CAULKING, CLEANING, AND BRICK REFRACTORY WORK ADDITIONAL $0.75 TO THE BASE WAGE FOR BRICK REFRACTORY WORK | $35.28 | $24.49 | $59.77 |
| MASON - STONE ADDITIONAL $0.75 TO THE BASE WAGE FOR BRICK REFRACTORY WORK | $35.28 | $24.49 | $59.77 |
| CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, METAL STUD INSTALLATION, FLOOR LAYING-HARDWOOD FLOORS, CARPET, FORM WORK, AND SCAFFOLD BUILDING) | $38.92 | $20.06 | $58.98 |
| PILEDRIVERMAN | $43.13 | $23.42 | $66.55 |
| MILLWRIGHT | $43.00 | $23.44 | $66.44 |
| ELECTRICIAN (HVAC/TEMPERATURE CONTROLS INSTALLATION ONLY) | $49.11 | $36.79 | $85.90 |
| ELECTRICIAN (INCLUDES ALARM INSTALLATION AND LOW VOLTAGE WIRING AND INSTALLATION OF SOUND AND COMMUNICATION SYSTEMS; EXCLUDES HVAC TEMPERATURE CONTROL INSTALLATION) | $51.45 | $29.77 | $81.22 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID STEER/SKID LOADER, BULLDOZER, COMPACTOR, CRANE*, DRILL RIG CAISSONS, DRILL, GRADALL, GRADER/BLADE, MAN LIFT/OUTSIDE ELEVATOR, MECHANIC, PAVER (ASPHALT, AGGREGATE, AND CONCRETE), SCRAPER, FORKLIFT (LULL) ADD $.75 BOOMS 151-200 JIBS- ADD $1.50 - BOOMS 201-251 JIBS- ADD $2.25 | $41.69 | $24.05 | $65.74 |
| POWER EQUIPMENT OPERATOR: BROOM/SWEEPER, COMPRESSOR, CONCRETE PUMP, HIGHLIFT, HOIST, PUMP, ROLLER, TUGBOAT, FORKLIFT (RIDDEN OR SELF-PROPELLED) | $35.62 | $24.05 | $59.67 |
| POWER EQUIPMENT OPERATOR: LOADER | $41.69 | $24.05 | $65.74 |
| POWER EQUIPMENT OPERATOR: OILER | $32.83 | $24.05 | $56.88 |
| IRONWORKER (ORNAMENTAL, REINFORCING, RIGGER AND STRUCTURAL; METAL BUILDINGS: METAL SIDING/WALL PANELS INSTALLATION) | $38.89 | $34.54 | $73.43 |
| LABORER (MASON TENDER - CEMENT/CONCRETE) | $30.24 | $12.05 | $42.29 |
| LABORER (ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, & CEILINGS)) | $27.97 | $20.39 | $48.36 |
| LABORER (MASON TENDER- BRICK) | $30.97 | $20.39 | $51.36 |
| LABORER: COMMON OR GENERAL | $27.82 | $20.39 | $48.21 |
| PAINTER (BRUSH, ROLLER, AND SPRAY, EXCLUDING WORK ON INDUSTRIAL SITES) | $30.56 | $23.72 | $54.28 |
| PAINTER: DRYWALL FINISHING/TAPING | $32.39 | $23.26 | $55.65 |
| PAINTER (INDUSTRIAL: BRUSH AND ROLLER ONLY) | $36.01 | $23.72 | $59.73 |
| PAINTER (INDUSTRIAL: SPRAY AND SANDBLASTER ONLY) | $36.01 | $23.72 | $59.73 |
| GLAZIER | $35.65 | $29.73 | $65.38 |
| CEMENT MASON/CONCRETE FINISHER | $31.77 | $21.89 | $53.66 |
| PLASTERER | $30.69 | $18.99 | $49.68 |
| PLUMBER | $48.65 | $25.47 | $74.12 |
| PIPEFITTER (INDUSTRIAL) | $52.50 | $30.17 | $82.67 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION, EXCLUDES WORK ON INDUSTRIAL SITES) | $48.15 | $29.17 | $77.32 |
| ROOFER (EXCLUDES METAL ROOF INSTALLATION AND WATERPROOFING) | $41.21 | $21.46 | $62.67 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $49.75 | $30.26 | $80.01 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT AND METAL ROOF INSTALLATION) | $46.75 | $35.93 | $82.68 |
| FLOOR LAYER: VINYL FLOORING | $28.11 | $7.03 | $35.14 |
| LABORER: ASPHALT RAKER | $20.92 | $9.09 | $30.01 |
| LABORER: LANDSCAPE | $18.10 | $0.00 | $18.10 |
| LABORER: LUTEMAN | $21.13 | $8.23 | $29.36 |
| ROOFER: WATERPROOFING ONLY | $25.07 | $7.33 | $32.40 |
| TRUCK DRIVER: DUMP TRUCK | $23.36 | $7.60 | $30.96 |
| INDUSTRIAL: PIPEFITTER | $43.62 | $20.23 | $63.85 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.