Building construction wages: Armstrong, Pennsylvania
Wage determination PA20260074 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/PA20260074 on · latest revision 7 · verify at sam.gov/wage-determination/PA20260074/7
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 7 | 2026-09-24 | diff vs rev 6 |
| rev 6 | 2026-08-20 | diff vs rev 5 |
| rev 5 | 2026-05-18 | diff vs rev 4 |
| rev 4 | 2026-05-17 | diff vs rev 3 |
| rev 3 | 2026-01-30 | diff vs rev 2 |
| rev 2 | 2026-01-23 | diff vs rev 1 |
| rev 1 | 2026-01-16 | diff vs rev 0 |
| rev 0 | 2026-01-09 | original |
Current rates (rev 7)
The CSV and the printed sheet are snapshots of rev 7. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (MECHANICAL- DUCT, PIPE & MECHANICAL SYSTEM INSULATION AND INDUSTRIAL WORK (INCLUDING DUCT AND PIPE)) | $46.50 | $29.43 | $75.93 |
| BOILERMAKER | $48.28 | $33.17 | $81.45 |
| TILE FINISHER | $28.76 | $17.16 | $45.92 |
| TILE SETTER | $35.64 | $21.63 | $57.27 |
| BRICKLAYER: INCLUDING POINTING, CAULKING, CLEANING AND BRICK REFRACTORY WORK ADDITIONAL $0.75 TO THE BASE WAGE FOR BRICK REFRACTORY WORK | $36.55 | $24.46 | $61.01 |
| MASON - STONE ADDITIONAL $0.75 TO THE BASE WAGE FOR BRICK REFRACTORY WORK | $36.55 | $24.46 | $61.01 |
| CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, METAL STUD INSTALLATION, FLOOR LAYING-HARDWOOD, CARPET AND VINYL; FORM WORK, AND SCAFFOLD BUILDING) | $38.92 | $20.06 | $58.98 |
| PILEDRIVERMAN | $43.13 | $23.42 | $66.55 |
| MILLWRIGHT | $49.00 | $26.29 | $75.29 |
| ELECTRICIAN (INCLUDES ALARM INSTALLATION, INSTALLATION OF SOUND AND COMMUNICATION SYSTEM, LOW VOLTAGE WIRING AND HVAC TEMPERATURE CONTROL INSTALLATION) | $49.11 | $36.79 | $85.90 |
| POWER EQUIPMENT OPERATOR: COMPRESSOR, CONCRETE PUMP, FORKLIFT (RIDDEN OR SELF-PROPELLED), HIGHLIFT, HOIST, ROLLER, TUGBOAT OPERATOR | $35.62 | $24.05 | $59.67 |
| POWER EQUIPMENT OPERATOR: LOADER | $41.69 | $24.05 | $65.74 |
| IRONWORKER (METAL ROOF INSTALLATION, ORNAMENTAL, REINFORCING, RIGGER AND STRUCTURAL; METAL BUILDINGS: METAL SIDING/WALL PANELS INSTALLATION) | $38.89 | $34.54 | $73.43 |
| LABORER (MASON TENDER - CEMENT/CONCRETE) | $30.24 | $12.05 | $42.29 |
| LABORER (ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, AND CEILINGS)) | $27.97 | $20.39 | $48.36 |
| PAINTER (BRUSH, ROLLER, AND SPRAY, EXCLUDING WORK ON INDUSTRIAL SITES) | $30.56 | $23.72 | $54.28 |
| PAINTER: DRYWALL FINISHING/TAPING | $32.39 | $23.26 | $55.65 |
| PAINTER (INDUSTRIAL: BRUSH AND ROLLER ONLY) | $36.01 | $23.72 | $59.73 |
| PAINTER (INDUSTRIAL: SPRAY AND SANDBLASTER ONLY) | $36.01 | $23.72 | $59.73 |
| GLAZIER | $35.65 | $29.73 | $65.38 |
| CEMENT MASON/CONCRETE FINISHER | $31.77 | $21.89 | $53.66 |
| PLASTERER | $30.69 | $18.99 | $49.68 |
| PLUMBER | $48.65 | $25.47 | $74.12 |
| PIPEFITTER (INDUSTRIAL) | $52.50 | $30.17 | $82.67 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION, EXCLUDES WORK ON INDUSTRIAL SITES) | $48.15 | $29.17 | $77.32 |
| ROOFER (INCLUDES WATERPROOFING, EXCLUDES METAL ROOF INSTALLATION) | $41.21 | $21.46 | $62.67 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $45.08 | $26.16 | $71.24 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $46.75 | $35.93 | $82.68 |
| LABORER: ASPHALT RAKER | $20.92 | $9.09 | $30.01 |
| LABORER: COMMON OR GENERAL | $20.92 | $9.09 | $30.01 |
| LABORER: LANDSCAPE | $18.10 | $0.00 | $18.10 |
| LABORER: LUTEMAN | $21.13 | $8.23 | $29.36 |
| LABORER: MASON TENDER - BRICK | $20.92 | $9.72 | $30.64 |
| OPERATOR: BROOM/SWEEPER | $24.83 | $14.13 | $38.96 |
| TRUCK DRIVER: DUMP TRUCK | $23.36 | $7.60 | $30.96 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.