Current rates (rev 4)
The CSV and the printed sheet are snapshots of rev 4. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (INDUSTRIAL; MECHANICAL- DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $46.50 | $29.43 | $75.93 |
| BOILERMAKER | $48.28 | $33.17 | $81.45 |
| TILE FINISHER | $28.76 | $17.16 | $45.92 |
| TILE SETTER | $35.64 | $21.63 | $57.27 |
| BRICKLAYER: INCLUDING POINTING, CAULKING, CLEANING AND BRICK REFRACTORY WORK ADDITIONAL $0.75 TO THE BASE WAGE FOR BRICK REFRACTORY WORK | $34.14 | $22.77 | $56.91 |
| MASON - STONE ADDITIONAL $0.75 TO THE BASE WAGE FOR BRICK REFRACTORY WORK | $34.14 | $22.77 | $56.91 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION, FLOOR LAYING-HARDWOOD FLOORS, CARPET, AND VINYL) | $35.94 | $19.02 | $54.96 |
| MILLWRIGHT | $43.00 | $23.44 | $66.44 |
| CARPENTER (SCAFFOLD BUILDING ONLY) | $35.94 | $19.02 | $54.96 |
| CARPENTER (DRYWALL HANGING, METAL STUD INSTALLATION AND FORM WORK ONLY) | $31.95 | $17.09 | $49.04 |
| ELECTRICIAN (INCLUDES INSTALLATION OF SOUND AND COMMUNICATION SYSTEM AND LOW VOLTAGE WIRING; EXCLUDES HVAC TEMPERATURE CONTROL INSTALLATION AND ALARM INSTALLATION) | $49.11 | $36.79 | $85.90 |
| ELECTRICIAN (ALARM INSTALLATION ONLY) | $51.45 | $29.77 | $81.22 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID STEER/SKID LOADER, LOADER, CRANE* | $36.87 | $21.32 | $58.19 |
| POWER EQUIPMENT OPERATOR: OILER | $29.70 | $21.32 | $51.02 |
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE), BULLDOZER, DRILL RIG CAISSONS, FORKLIFT (LULL), MAN LIFT/OUTSIDE ELEVATOR | $36.87 | $21.32 | $58.19 |
| POWER EQUIPMENT OPERATOR: ROLLER, FORKLIFT (RIDDEN OR SELF-PROPELLED) | $32.25 | $21.32 | $53.57 |
| IRONWORKER (REINFORCING, STRUCTURAL AND METAL ROOF INSTALLATION ONLY) | $36.26 | $28.16 | $64.42 |
| LABORER (COMMON OR GENERAL; CONCRETE WORKER) | $26.82 | $19.39 | $46.21 |
| PAINTER (SPRAY ONLY, EXCLUDES WORK ON INDUSTRIAL SITES) | $27.95 | $16.12 | $44.07 |
| PAINTER: BRUSH AND ROLLER ONLY | $30.56 | $23.72 | $54.28 |
| PAINTER: DRYWALL FINISHING/TAPING ONLY | $32.39 | $23.26 | $55.65 |
| PAINTER (INDUSTRIAL: SPRAY ONLY) | $36.01 | $23.72 | $59.73 |
| GLAZIER | $28.30 | $10.73 | $39.03 |
| CEMENT MASON/CONCRETE FINISHER | $31.77 | $21.89 | $53.66 |
| PLASTERER | $30.69 | $18.99 | $49.68 |
| PLUMBER | $46.98 | $25.47 | $72.45 |
| PIPEFITTER (INDUSTRIAL) | $47.75 | $26.55 | $74.30 |
| PIPEFITTER (EXCLUDES HVAC PIPE INSTALLATION AND WORK ON INDUSTRIAL SITES) | $40.02 | $26.55 | $66.57 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $48.15 | $29.17 | $77.32 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $49.75 | $30.26 | $80.01 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION, EXCLUDES METAL FLASHING INSTALLATION) | $46.75 | $35.93 | $82.68 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING AND METAL STUD INSTALLATION, FLOOR LAYER - CARPET, HARDWOOD, AND VINYL, FORM WORK AND SCAFFOLD BUILDING | $25.57 | $10.53 | $36.10 |
| ELECTRICIAN (HVAC/TEMPERATURE CONTROLS INSTALLATION ONLY) | $29.05 | $16.89 | $45.94 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $18.41 | $6.45 | $24.86 |
| MECHANICAL INSULATOR, INCLUDING DUCT AND PIPE AND EXCLUDING WORK ON INDUSTRIAL SITES | $30.60 | $17.16 | $47.76 |
| ROOFER, EXCLUDES INSTALLATION OF METAL ROOFS | $24.13 | $11.95 | $36.08 |
| SHEET METAL WORKER (METAL FLASHING INSTALLATION ONLY) | $31.43 | $20.05 | $51.48 |
| TRUCK DRIVER: DUMP TRUCK | $24.98 | $11.88 | $36.86 |
| LABORER: MASON TENDER - BRICK | $23.23 | $18.53 | $41.76 |
| OPERATOR: MECHANIC | $36.53 | $22.01 | $58.54 |
| IRONWORKER: ORNAMENTAL | $34.91 | $30.85 | $65.76 |
| IRONWORKER, RIGGER | $35.22 | $30.56 | $65.78 |
| OPERATOR: HIGHLIFT | $31.19 | $22.01 | $53.20 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.