Building construction wages: Mifflin, Pennsylvania

Wage determination PA20260060 · Active · Standard · verify on SAM.gov

Mifflin

Get an email when this determination changes.This determination changed 3 times in the last 12 months, most recently 2026-09-24: 1 rate change (MILLWRIGHT $43.00 → $49.00).
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 32026-09-24diff vs rev 2
rev 22026-05-18diff vs rev 1
rev 12026-05-17diff vs rev 0
rev 02026-01-16original

Current rates (rev 3)

Download CSV

The CSV and the printed sheet are snapshots of rev 3. If DOL revises this determination after you save one, the watch above tells you exactly what moved.

ClassificationRateFringeTotal
ASBESTOS WORKER/HEAT & FROST INSULATOR (MECHANICAL- DUCT, PIPE & MECHANICAL SYSTEM INSULATION)$39.18$26.07$65.25
BOILERMAKER$48.28$33.17$81.45
BRICKLAYER (INCLUDING POINTING, CAULKING, AND CLEANING)$32.66$21.58$54.24
MASON - STONE$32.66$21.58$54.24
TERRAZZO FINISHER$33.23$19.03$52.26
TERRAZZO WORKER/GRINDER$33.94$19.03$52.97
TERRAZZO WORKER/SETTER$33.83$20.78$54.61
TILE FINISHER$28.76$17.16$45.92
TILE SETTER$35.64$21.63$57.27
CARPENTER (DRYWALL HANGING, METAL STUD INSTALLATION, FORM WORK AND SCAFFOLD BUILDING ONLY)$34.76$20.64$55.40
MILLWRIGHT$49.00$26.29$75.29
CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, METAL STUD INSTALLATION, FORM WORK, AND SCAFFOLD BUILDING)$34.76$20.64$55.40
ELECTRICIAN (ALARM INSTALLATION, INSTALLATION OF SOUND AND COMMUNICATION SYSTEMS, AND LOW VOLTAGE WIRING ONLY)$39.27$22.28$61.55
ELEVATOR MECHANIC$61.41$38.44$99.85
POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE AND CONCRETE)$36.87$21.32$58.19
POWER EQUIPMENT OPERATOR (BULLDOZER, LOADER, FORKLIFT (20 FT. AND OVER, EXCLUDES MASONRY WORK))$44.61$30.83$75.44
POWER EQUIPMENT OPERATOR (FORKLIFT (UNDER 20 FT., EXCLUDES MASONRY WORK))$41.88$30.03$71.91
POWER EQUIPMENT OPERATOR: CRANE$47.14$31.58$78.72
IRONWORKER (STRUCTURAL AND REINFORCING)$37.26$32.63$69.89
LABORER (COMMON OR GENERAL)$26.31$17.05$43.36
LABORER (FORKLIFT (MASONRY WORK ONLY))$25.29$15.04$40.33
LABORER (VIBRATING PLATE)$21.57$15.04$36.61
PAINTER: BRUSH, ROLLER, AND SPRAY$27.95$16.12$44.07
PIPEFITTER (HVAC PIPE INSTALLATION ONLY)$41.36$29.45$70.81
PLUMBER (EXCLUDES HVAC UNIT INSTALLATION)$41.36$29.45$70.81
PIPEFITTER (EXCLUDES HVAC PIPE INSTALLATION)$51.69$27.07$78.76
SHEET METAL WORKER: EXCLUDING HVAC DUCT INSTALLATION$43.09$42.52$85.61
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)$36.13$30.32$66.45
CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY)$25.71$12.02$37.73
CEMENT MASON/CONCRETE FINISHER$19.81$9.03$28.84
ELECTRICIAN (HVAC/TEMPERATURE CONTROLS INSTALLATION ONLY)$25.44$12.35$37.79
ELECTRICIAN, EXCLUDES ALARM INSTALLATION, SOUND AND COMMUNICATION INSTALLATION, HVAC/TEMPERATURE CONTROL INSTALLATION, AND LOW VOLTAGE WIRING$26.80$13.68$40.48
LABORER: MASON TENDER - CEMENT/CONCRETE$16.09$3.44$19.53
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$29.88$14.13$44.01
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$26.96$13.93$40.89
PLUMBER (HVAC UNIT INSTALLATION)$24.31$3.95$28.26
ROOFER$41.37$13.28$54.65
TRUCK DRIVER: DUMP TRUCK$24.98$11.88$36.86
OPERATOR: MECHANIC$36.53$22.01$58.54
IRONWORKER: ORNAMENTAL$34.65$31.12$65.77
LABORER: MASON TENDER - BRICK$22.29$15.92$38.21
OPERATOR: OILER$37.10$27.62$64.72

Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.