Building construction wages: Cameron, Pennsylvania
Wage determination PA20260045 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/PA20260045 on · latest revision 3 · verify at sam.gov/wage-determination/PA20260045/3
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 3 | 2026-08-20 | diff vs rev 2 |
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-09 | original |
Current rates (rev 3)
The CSV and the printed sheet are snapshots of rev 3. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $48.28 | $33.17 | $81.45 |
| TILE FINISHER | $28.76 | $17.16 | $45.92 |
| TILE SETTER | $35.64 | $21.63 | $57.27 |
| CARPENTER (SCAFFOLD BUILDING ONLY) | $34.76 | $20.64 | $55.40 |
| CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, METAL STUD INSTALLATION, FLOOR LAYING-CARPET AND VINYL, FORM WORK AND GUTTER INSTALLATION; EXCLUDES SCAFFOLD BUILDING) | $34.76 | $20.64 | $55.40 |
| MILLWRIGHT | $43.00 | $23.44 | $66.44 |
| ELECTRICIAN (INCLUDES INSTALLATION OF SOUND AND COMMUNICATION SYSTEM AND LOW VOLTAGE WIRING; EXCLUDES HVAC TEMPERATURE CONTROL INSTALLATION AND ALARM INSTALLATION) | $50.86 | $31.78 | $82.64 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID STEER/SKID LOADER, BULLDOZER, CRANE*, LOADER | $36.87 | $21.32 | $58.19 |
| POWER EQUIPMENT OPERATOR: OILER | $29.70 | $21.32 | $51.02 |
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $36.87 | $21.32 | $58.19 |
| POWER EQUIPMENT OPERATOR: ROLLER | $32.25 | $21.32 | $53.57 |
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE AND CONCRETE) | $36.87 | $21.32 | $58.19 |
| IRONWORKER: ORNAMENTAL, REINFORCING, RIGGER, AND STRUCTURAL | $32.29 | $32.41 | $64.70 |
| LABORER (CONCRETE WORKER) | $25.98 | $19.53 | $45.51 |
| PAINTER (SPRAY ONLY) | $27.95 | $16.12 | $44.07 |
| PAINTER: BRUSH AND ROLLER ONLY | $30.56 | $23.72 | $54.28 |
| PAINTER: DRYWALL FINISHING/TAPING ONLY | $32.39 | $23.26 | $55.65 |
| GLAZIER | $25.40 | $25.47 | $50.87 |
| CEMENT MASON/CONCRETE FINISHER | $31.97 | $21.35 | $53.32 |
| PIPEFITTER (INDUSTRIAL) | $47.75 | $26.55 | $74.30 |
| PLUMBER | $40.02 | $26.55 | $66.57 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION AND HVAC UNIT INSTALLATION, EXCLUDES WORK ON INDUSTRIAL SITES) | $40.02 | $26.55 | $66.57 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $49.75 | $28.96 | $78.71 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION) | $46.75 | $35.93 | $82.68 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $33.62 | $18.79 | $52.41 |
| ELECTRICIAN (ALARM INSTALLATION ONLY) | $38.01 | $17.13 | $55.14 |
| LABORER: COMMON OR GENERAL, INCLUDING CEMENT MASON TENDING | $18.43 | $9.74 | $28.17 |
| OPERATOR: FORKLIFT, ALL TYPES | $23.69 | $12.97 | $36.66 |
| PLASTERER | $20.97 | $10.78 | $31.75 |
| ROOFER | $27.00 | $12.19 | $39.19 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $30.58 | $24.04 | $54.62 |
| TRUCK DRIVER: DUMP TRUCK | $24.98 | $12.17 | $37.15 |
| BRICKLAYER, INCLUDING POINTING, CAULKING CLEANING AND BRICK REFRACTORY WORK | $37.17 | $22.94 | $60.11 |
| LABORER: MASON TENDER - BRICK | $23.23 | $18.53 | $41.76 |
| MASON - STONE | $34.00 | $22.63 | $56.63 |
| OPERATOR: MECHANIC | $36.53 | $22.01 | $58.54 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.