PA20260037: rev 1 → rev 2

2 rate changes, 2 added, 3 removed.

Rate changes

Rates below include fringe (the full hourly package). Enter your remaining crew hours per classification to price this change for a job.

ClassificationOld totalNew totalΔ/hrHours on jobCost impact
ELECTRICIAN (BARRETT, COLLBAUGH, PARADISE, PRICE, AND TOBYHANNA TOWNSHIPS)$39.77$40.48+0.71
ELECTRICIAN (REMAINDER OF COUNTY)$126.88$103.63-23.25

Added classifications

LABORER: GROUP 4 SKID-STEERING LOADER AND FOLKLIFT LABORERS. OPERATION OF ROUGH TERRAIN FORKLIFTS, SKID-STEERING LOADERS$25.34$17.14
LABORER: GROUP 3 MASON TENDERS, MIXING OF MORTAR, PLASTER AND MORTAR PUMPS, PLASTER TENDERS, CAISSON WORK, BLAST FURNACES, COKE OVENS AND ALL RELATED WORK, ERECTION AND DISMANTLING OF ALL SCAFFOLDING, INCLUDING TUBULAR FRAME, MANUAL AND POWERED CLIMBING SCAFFOLD, SWING SCAFFOLDS, SLINGS, BOSUM CHAIRS, AND ALL ASSOCIATED SAFETY PROTECTION INCLUDING BARRICADES, NETS AND ROPES, SCAFFOLD WEATHER ENCLOSURES; SHORING; MORTAR BUGGIES; CONCRETE PUMPS; WALK-BEHIND FORKLIFTS; ELECTRIC WELDERS TORCHES, COMPRESSORS, GENERATORS AND THE REPAIR AND MAINTENANCE OF SAME; JACKHAMMERS, TAMPERS; CUT-OFF SAWS & OTHER POWER EQUIPMENT REQUIRED FOR DEMOLITION; ROTARY-HAMMER DRILLS, ELECTRIC & PNEUMATIC HAND-TOOLS; TRANSIT, LEVELS & LASERS; TEMPERING MOTAR; STOCKING SCAFFOLDS WITH MASONRY MATERIALS INCLUDING BRICK, BLOCK, MORTAR, TEERA COTTA, ARCHITECTURAL PRE-CAST CONCRETE, NATURAL STONE, INSULATION & MASTIC, FLASHING, ANCHORS & TIES, GROUNT; MOBILE LIFTING PLATFORM SCAFFORING POWERED BY ANY POWER MODE OR METHOD ; CLEANING OF ALL MASONRY DEBRIS$25.34$17.14

Removed classifications

to exceed 4 unitswas $13.63
Laborers - GROUP 3was $25.34
Laborers - GROUP 4was $25.34