Building construction wages: Marion, Polk, Oregon
Wage determination OR20260104 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/OR20260104 on · latest revision 1 · verify at sam.gov/wage-determination/OR20260104/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| HEAT & FROST INSULATOR | $62.02 | $22.36 | $84.38 |
| BRICKLAYER | $49.60 | $25.15 | $74.75 |
| TILE SETTER | $43.93 | $21.81 | $65.74 |
| TILE FINISHER | $32.68 | $16.48 | $49.16 |
| ELECTRICIAN | $56.46 | $23.05 | $79.51 |
| OPERATOR: LOADER | $54.75 | $16.90 | $71.65 |
| OPERATOR: GRADER/BLADE | $54.75 | $16.90 | $71.65 |
| OPERATOR: BULLDOZER | $54.75 | $16.90 | $71.65 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $54.75 | $16.90 | $71.65 |
| OPERATOR: OILER | $45.81 | $16.90 | $62.71 |
| OPERATOR: FORKLIFT | $45.81 | $16.90 | $62.71 |
| OPERATOR: ROLLER | $50.27 | $16.90 | $67.17 |
| OPERATOR: CRANE (90-199 TON) | $54.75 | $16.90 | $71.65 |
| OPERATOR: CRANE (300-399 TON) | $58.82 | $16.90 | $75.72 |
| IRONWORKER | $48.31 | $34.52 | $82.83 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $43.79 | $17.05 | $60.84 |
| LABORER: COMMON OR GENERAL | $39.11 | $17.30 | $56.41 |
| LABORER: HOD CARRIER | $43.79 | $17.05 | $60.84 |
| LABORER: PIPELAYER | $40.41 | $17.30 | $57.71 |
| DRYWALL FINISHER/TAPER | $45.52 | $22.03 | $67.55 |
| PAINTER | $40.85 | $16.68 | $57.53 |
| GLAZIER | $53.15 | $23.21 | $76.36 |
| CEMENT MASON/CONCRETE FINISHER | $46.13 | $20.31 | $66.44 |
| PIPEFITTER | $60.77 | $34.72 | $95.49 |
| PLUMBER | $60.77 | $34.72 | $95.49 |
| SHEET METAL WORKER | $54.99 | $33.92 | $88.91 |
| TRUCK DRIVER: DUMP TRUCK | $21.30 | $5.66 | $26.96 |
| ROOFER | $27.49 | $0.00 | $27.49 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $35.76 | $3.60 | $39.36 |
| OPERATOR: DRILL | $29.27 | $0.00 | $29.27 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.43 | $2.31 | $22.74 |
| CARPENTER | $31.04 | $0.00 | $31.04 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.