Residential construction wages: Klamath, Oregon
Wage determination OR20260007 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/OR20260007 on · latest revision 2 · verify at sam.gov/wage-determination/OR20260007/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-23 | original |
Current rates (rev 2)
The CSV and the printed sheet are snapshots of rev 2. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTERS: (INCLUDING FORM WORK-SINGLE UNIT) | $33.48 | $14.03 | $47.51 |
| CARPENTERS: (INCLUDING FORM WORK-MULTI UNIT) | $36.27 | $14.03 | $50.30 |
| ELECTRICIAN | $33.41 | $18.20 | $51.61 |
| POWER EQUIPMENT OPERATOR GROUP 6 LOADERS: (LESS THAN 1 CU YD.); GRADE CHECKER; ROLLER (NON-ASPHALT) | $45.81 | $16.90 | $62.71 |
| POWER EQUIPMENT OPERATOR GROUP 5 ROLLER OPERATOR; BULLDOZERS: BULLDOZER OPERATOR, 20,000 LBS. OR LESS OR 100 HORSE OR LESS; HYDRAULIC HOES EXCAVATORS/TRACKHOE: HYDRAULIC BACKHOE OPERATOR, WHEEL TYPE (FORD, JOHN DEERE, CASE TYPE); HYDRAULIC BACKHOE OPERATOR TRACK TYPE UP TO AND INCLUDING 20,000 LBS.; LOADERS: LOADERS, RUBBER- TIRED TYPE, LESS THAN 25,000 LBS; CONCRETE PUMPER; CONCRETE PAVER | $49.03 | $16.90 | $65.93 |
| POWER EQUIPMENT OPERATOR GROUP 4 BULLDOZERS: BULLDOZER OPERATOR OVER 20,000 LBS AND MORE THAN 100 HORSE UP TO 70,000 LBS; HYDRAULIC HOES EXCAVATOR/TRACKHOE: ROBOTIC HYDRAULIC BACKHOE OPERATOR, TRACK AND WHEEL TYPE UP TO AND INCLUDING 20,0000 LBS. WITH ANY OR ALL ATTACHMENTS; EXCAVATOR OPERATOR OVER 20,000 LBS THROUGH 80,000 LBS.; LOADERS: LOADERS OPERATOR, FRONT END AND OVERHEAD, 25,000 LBS AND LESS THAN 60,000 LBS; RUBBER-TIRED DOZERS; ASPHALT PAVER; SCREED OPERATOR; BLADE OPERATOR; RUBBER-TIRED SCRAPER, SINGLE ENGINE, SINGLE SCRAPER | $50.27 | $16.90 | $67.17 |
| POWER EQUIPMENT OPERATOR GROUP 3 BULLDOZERS: BULLDOZER OPERATOR, OVER 70,000 LBS. UP TO AND INCLUDING 120,000 LBS.; HYDRAULIC HOES-EXCAVATOR: EXCAVATOR OVER 80,000 LBS. THROUGH 130,000 LBS.; LOADERS: LOADER OPERATOR 60,000 AND LESS THAN 120,000; RUBBER TIRED SCRAPER: WITH TANDOM SCRAPERS; SELF LOADING, PADDLE WHEEL, AUGER TYPE, FINISH AND/OR 2 OR MORE UNITS | $53.60 | $16.90 | $70.50 |
| POWER EQUIPMENT OPERATOR GROUP 2 BULLDOZERS: BULLDOZER OPERATOR OVER 120,000 LBS AND ABOVE; BULLDOZER OPERATOR, TWIN ENGINE; BULLDOZER OPERATOR,TANDEM, QUADNINE, D10, D11, AND SIMILAR TYPE; LOADERS: LOADER OPERATOR, 120,000 LBS. AND ABOVE; HYDRAULIC HOES-EXCAVATOR: EXCAVATOR OVER 130,000 LBS; BLADE OPERATOR-ROBOTIC; RUBBER TIRED SCRAPER WITH TANDOM SCRAPERS, MULTI-ENGINE | $54.75 | $16.90 | $71.65 |
| LABORERS: (MASON TENDER-CEMENT/CONCRETE) | $43.79 | $17.05 | $60.84 |
| LABORERS: (GENERAL LABORER) | $39.00 | $17.30 | $56.30 |
| CEMENT MASON/CONCRETE FINISHER | $46.13 | $20.31 | $66.44 |
| ROOFER | $14.41 | $0.00 | $14.41 |
| TRUCK DRIVERS: GROUP 7 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 80 CU. YDS. AND INCLUDING 100 CU. YDS., INCLUDES ARTICULATED DUMP TRUCKS | $36.82 | $18.30 | $55.12 |
| TRUCK DRIVERS: GROUP 6 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 60 CU. YDS. AND INCLUDING 80 CU. YDS. AND INCLUDES ARTICULATED DUMP TRUCKS | $36.57 | $18.30 | $54.87 |
| TRUCK DRIVERS: GROUP 5 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 50 CU. YDS. AND INCLUDING 60 CU. YDS. AND INCLUDES ARTICULATED DUMP TRUCKS | $36.35 | $18.30 | $54.65 |
| TRUCK DRIVERS: GROUP 4 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 30 CU. YDS. AND INCLUDING 50 CU. YDS. AND INCLUDES ARTICULATED DUMP TRUCKS | $36.08 | $18.30 | $54.38 |
| TRUCK DRIVERS: GROUP 3 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 10 CU. YDS. AND INCLUDING 30 CU. YDS., INCLUDES ARTICULATED DUMP TRUCKS | $35.74 | $18.30 | $54.04 |
| TRUCK DRIVERS: GROUP 2 DUMP TRCUKS/ARTICULATED DUMPS 6 CU TO 10 CU.; | $35.57 | $18.30 | $53.87 |
| TRUCK DRIVERS: GROUP 1 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: UP TO AND INCLUDING 10 CU. YDS | $35.41 | $18.30 | $53.71 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.