Building construction wages: Le Flore, Sequoyah, Oklahoma

Wage determination OK20260054 · Active · Standard · verify on SAM.gov

Le FloreSequoyah

Get an email when this determination changes.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 22026-05-18diff vs rev 1
rev 12026-05-17diff vs rev 0
rev 02026-01-23original

Current rates (rev 2)

Download CSV
ClassificationRateFringeTotal
BRICKLAYER$26.92$13.09$40.01
ELECTRICIAN (LE FLORE (ENTIRE COUNTY EXCEPT BRADEN, POCOLA AND SPIRO TOWNSHIPS) AND SEQUOYAH (THAT PORTION WEST OF AKINS, GANS, HANSEN, LONG AND REDLAND TOWNSHIPS) COUNTIES)$38.38$12.89$51.27
ELECTRICIAN (LEFLORE (BRADEN, POCOLA AND SPIRO TOWNSHIPS ONLY) AND SEQUOYAH (THAT PORTION EAST OF BRENT, PRICES CHAPEL, ROCKY MOUNTAIN AND SALLISAW TOWNSHIPS) COUNTIES)$30.03$14.03$44.06
POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT$28.77$19.05$47.82
POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER$34.07$19.05$53.12
POWER EQUIPMENT OPERATOR: GROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST)$35.40$19.05$54.45
POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY$36.14$19.05$55.19
POWER EQUIPMENT OPERATOR: GROUP 10 OILER; SEMI- TRAILER TRUCK DRIVER$27.25$19.05$46.30
POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES$38.09$19.05$57.14
IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL$30.35$16.83$47.18
PLUMBER$36.65$16.48$53.13
PIPEFITTER$36.65$16.03$52.68
ROOFER$26.30$10.34$36.64
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)$35.49$14.60$50.09
TRUCK DRIVER: DUMP AND FLATBED TRUCK$11.00$0.00$11.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION$22.18$5.06$27.24
PAINTER: BRUSH, ROLLER AND SPRAY$12.22$0.00$12.22
OPERATOR: LOADER (FRONT END)$16.18$0.00$16.18
OPERATOR: GRADER/BLADE$14.28$1.70$15.98
OPERATOR: BULLDOZER$20.64$2.35$22.99
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$17.38$4.08$21.46
LABORER: PIPELAYER$12.39$0.00$12.39
LABORER: MASON TENDER - CEMENT/CONCRETE$13.00$1.91$14.91
LABORER: MASON TENDER - BRICK$12.52$0.00$12.52
LABORER: COMMON OR GENERAL$9.63$0.00$9.63
CEMENT MASON/CONCRETE FINISHER$14.26$1.27$15.53
CARPENTER$15.86$0.00$15.86