Building construction wages: Pawnee, Oklahoma

Wage determination OK20260051 · Active · Standard · verify on SAM.gov

Pawnee

Get an email when this determination changes.This determination changed once in the last 12 months, most recently 2026-05-18: 1 rate change (ELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING AND IN… $38.38 → $38.38).
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1)

Download CSV

The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.

ClassificationRateFringeTotal
BRICKLAYER$26.92$13.09$40.01
ELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS AND SOUND AND COMMUNICATION SYSTEMS (PAWNEE COUNTY (THAT PORTION WEST OF HIGHWAY #18))$41.25$13.30$54.55
ELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS AND SOUND AND COMMUNICATION SYSTEMS (PAWNEE COUNTY (THAT PORTION EAST OF STATE HIGHWAY #18))$38.38$12.89$51.27
ELEVATOR MECHANIC PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE$51.24$38.44$89.68
POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT$28.77$19.05$47.82
POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER$34.07$19.05$53.12
POWER EQUIPMENT OPERATOR: GROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST)$35.40$19.05$54.45
POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY$36.14$19.05$55.19
POWER EQUIPMENT OPERATOR: GROUP 10 OILER; SEMI- TRAILER TRUCK DRIVER$27.25$19.05$46.30
POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES$38.09$19.05$57.14
IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL$30.35$16.83$47.18
PLUMBER (EXCLUDES HVAC PIPE INSTALLATION)$36.65$16.03$52.68
HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT)$36.65$16.03$52.68
PIPEFITTER (INCLUDING HVAC PIPE INSTALLATION, EXCLUDING HVAC UNIT INSTALLATION)$36.65$16.03$52.68
ROOFER$26.30$10.34$36.64
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)$35.49$14.60$50.09
TRUCK DRIVER: DUMP AND FLATBED TRUCK$11.00$0.00$11.00
SPRINKLER FITTER (FIRE SPRINKLERS)$21.86$1.19$23.05
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION$22.18$5.06$27.24
PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING$12.22$0.00$12.22
OPERATOR: LOADER (FRONT END)$16.18$0.00$16.18
OPERATOR: GRADER/BLADE$14.28$1.70$15.98
OPERATOR: BULLDOZER$20.64$2.35$22.99
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$17.23$4.08$21.31
OPERATOR: ASPHALT PAVER$16.88$0.00$16.88
LABORER: PIPELAYER$12.39$0.00$12.39
LABORER: MASON TENDER - CEMENT/CONCRETE$13.00$1.91$14.91
LABORER: MASON TENDER - BRICK$12.52$0.00$12.52
LABORER: COMMON OR GENERAL$12.45$2.79$15.24
FORM WORKER$13.77$0.38$14.15
ELECTRICIAN: ALARM INSTALLATION$19.00$3.20$22.20
ELECTRICIAN (SOUND AND COMMUNICATIONS SYSTEMS INSTALLATION)$20.66$2.64$23.30
ELECTRICIAN (LOW VOLTAGE WIRING)$20.79$3.85$24.64
DRYWALL FINISHER/TAPER$13.00$0.00$13.00
CEMENT MASON/CONCRETE FINISHER$14.26$1.27$15.53
CAULKER$20.00$1.61$21.61
CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK$14.58$1.57$16.15
CARPENTER (DRYWALL HANGING ONLY)$15.07$1.22$16.29

Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.