Building construction wages: Pawnee, Oklahoma
Wage determination OK20260051 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/OK20260051 on · latest revision 1 · verify at sam.gov/wage-determination/OK20260051/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $26.92 | $13.09 | $40.01 |
| ELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS AND SOUND AND COMMUNICATION SYSTEMS (PAWNEE COUNTY (THAT PORTION WEST OF HIGHWAY #18)) | $41.25 | $13.30 | $54.55 |
| ELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS AND SOUND AND COMMUNICATION SYSTEMS (PAWNEE COUNTY (THAT PORTION EAST OF STATE HIGHWAY #18)) | $38.38 | $12.89 | $51.27 |
| ELEVATOR MECHANIC PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | $51.24 | $38.44 | $89.68 |
| POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT | $28.77 | $19.05 | $47.82 |
| POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER | $34.07 | $19.05 | $53.12 |
| POWER EQUIPMENT OPERATOR: GROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST) | $35.40 | $19.05 | $54.45 |
| POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY | $36.14 | $19.05 | $55.19 |
| POWER EQUIPMENT OPERATOR: GROUP 10 OILER; SEMI- TRAILER TRUCK DRIVER | $27.25 | $19.05 | $46.30 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $38.09 | $19.05 | $57.14 |
| IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL | $30.35 | $16.83 | $47.18 |
| PLUMBER (EXCLUDES HVAC PIPE INSTALLATION) | $36.65 | $16.03 | $52.68 |
| HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT) | $36.65 | $16.03 | $52.68 |
| PIPEFITTER (INCLUDING HVAC PIPE INSTALLATION, EXCLUDING HVAC UNIT INSTALLATION) | $36.65 | $16.03 | $52.68 |
| ROOFER | $26.30 | $10.34 | $36.64 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $35.49 | $14.60 | $50.09 |
| TRUCK DRIVER: DUMP AND FLATBED TRUCK | $11.00 | $0.00 | $11.00 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $21.86 | $1.19 | $23.05 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $22.18 | $5.06 | $27.24 |
| PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING | $12.22 | $0.00 | $12.22 |
| OPERATOR: LOADER (FRONT END) | $16.18 | $0.00 | $16.18 |
| OPERATOR: GRADER/BLADE | $14.28 | $1.70 | $15.98 |
| OPERATOR: BULLDOZER | $20.64 | $2.35 | $22.99 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $17.23 | $4.08 | $21.31 |
| OPERATOR: ASPHALT PAVER | $16.88 | $0.00 | $16.88 |
| LABORER: PIPELAYER | $12.39 | $0.00 | $12.39 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $13.00 | $1.91 | $14.91 |
| LABORER: MASON TENDER - BRICK | $12.52 | $0.00 | $12.52 |
| LABORER: COMMON OR GENERAL | $12.45 | $2.79 | $15.24 |
| FORM WORKER | $13.77 | $0.38 | $14.15 |
| ELECTRICIAN: ALARM INSTALLATION | $19.00 | $3.20 | $22.20 |
| ELECTRICIAN (SOUND AND COMMUNICATIONS SYSTEMS INSTALLATION) | $20.66 | $2.64 | $23.30 |
| ELECTRICIAN (LOW VOLTAGE WIRING) | $20.79 | $3.85 | $24.64 |
| DRYWALL FINISHER/TAPER | $13.00 | $0.00 | $13.00 |
| CEMENT MASON/CONCRETE FINISHER | $14.26 | $1.27 | $15.53 |
| CAULKER | $20.00 | $1.61 | $21.61 |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK | $14.58 | $1.57 | $16.15 |
| CARPENTER (DRYWALL HANGING ONLY) | $15.07 | $1.22 | $16.29 |