Building construction wages: Comanche, Oklahoma
Wage determination OK20260043 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/OK20260043 on · latest revision 1 · verify at sam.gov/wage-determination/OK20260043/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $26.92 | $13.09 | $40.01 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | $41.40 | $13.14 | $54.54 |
| POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT | $28.77 | $19.05 | $47.82 |
| POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER | $34.07 | $19.05 | $53.12 |
| POWER EQUIPMENT OPERATOR: GROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST) | $35.40 | $19.05 | $54.45 |
| POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY | $36.14 | $19.05 | $55.19 |
| POWER EQUIPMENT OPERATOR: GROUP 10 OILER; SEMI- TRAILER TRUCK DRIVER | $27.25 | $19.05 | $46.30 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $38.09 | $19.05 | $57.14 |
| IRONWORKER: ORNAMENTAL AND STRUCTURAL | $32.10 | $17.38 | $49.48 |
| PLUMBER (EXCLUDES HVAC PIPE INSTALLATION) | $41.00 | $16.03 | $57.03 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION | $41.00 | $16.03 | $57.03 |
| ROOFER | $26.30 | $10.34 | $36.64 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $33.38 | $16.36 | $49.74 |
| TRUCK DRIVER: DUMP AND FLATBED TRUCK | $11.60 | $0.00 | $11.60 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $21.82 | $0.00 | $21.82 |
| PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING | $12.91 | $0.00 | $12.91 |
| OPERATOR: LOADER (FRONT END) | $16.18 | $0.00 | $16.18 |
| OPERATOR: GRADER/BLADE | $14.28 | $1.70 | $15.98 |
| OPERATOR: BULLDOZER | $20.64 | $2.35 | $22.99 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.25 | $4.35 | $25.60 |
| LABORER: PIPELAYER | $12.39 | $0.00 | $12.39 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $13.00 | $1.91 | $14.91 |
| LABORER: MASON TENDER - BRICK | $12.00 | $0.00 | $12.00 |
| LABORER: COMMON OR GENERAL | $9.31 | $0.00 | $9.31 |
| IRONWORKER, REINFORCING | $17.11 | $0.00 | $17.11 |
| ELECTRICIAN (LOW VOLTAGE WIRING) | $20.08 | $5.43 | $25.51 |
| DRYWALL FINISHER/TAPER | $13.80 | $0.00 | $13.80 |
| CEMENT MASON/CONCRETE FINISHER | $16.72 | $0.00 | $16.72 |
| CARPENTER, EXCLUDES DRYWALL HANGING | $15.50 | $2.80 | $18.30 |
| CARPENTER (DRYWALL HANGING ONLY) | $15.50 | $2.80 | $18.30 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.