Building construction wages: Comanche, Oklahoma

Wage determination OK20260043 · Active · Standard · verify on SAM.gov

Comanche

Get an email when this determination changes.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1)

Download CSV
ClassificationRateFringeTotal
BRICKLAYER$26.92$13.09$40.01
ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING)$41.40$13.14$54.54
POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT$28.77$19.05$47.82
POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER$34.07$19.05$53.12
POWER EQUIPMENT OPERATOR: GROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST)$35.40$19.05$54.45
POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY$36.14$19.05$55.19
POWER EQUIPMENT OPERATOR: GROUP 10 OILER; SEMI- TRAILER TRUCK DRIVER$27.25$19.05$46.30
POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES$38.09$19.05$57.14
IRONWORKER: ORNAMENTAL AND STRUCTURAL$32.10$17.38$49.48
PLUMBER (EXCLUDES HVAC PIPE INSTALLATION)$41.00$16.03$57.03
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION$41.00$16.03$57.03
ROOFER$26.30$10.34$36.64
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)$33.38$16.36$49.74
TRUCK DRIVER: DUMP AND FLATBED TRUCK$11.60$0.00$11.60
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION$21.82$0.00$21.82
PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING$12.91$0.00$12.91
OPERATOR: LOADER (FRONT END)$16.18$0.00$16.18
OPERATOR: GRADER/BLADE$14.28$1.70$15.98
OPERATOR: BULLDOZER$20.64$2.35$22.99
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$21.25$4.35$25.60
LABORER: PIPELAYER$12.39$0.00$12.39
LABORER: MASON TENDER - CEMENT/CONCRETE$13.00$1.91$14.91
LABORER: MASON TENDER - BRICK$12.00$0.00$12.00
LABORER: COMMON OR GENERAL$9.31$0.00$9.31
IRONWORKER, REINFORCING$17.11$0.00$17.11
ELECTRICIAN (LOW VOLTAGE WIRING)$20.08$5.43$25.51
DRYWALL FINISHER/TAPER$13.80$0.00$13.80
CEMENT MASON/CONCRETE FINISHER$16.72$0.00$16.72
CARPENTER, EXCLUDES DRYWALL HANGING$15.50$2.80$18.30
CARPENTER (DRYWALL HANGING ONLY)$15.50$2.80$18.30