Building construction wages: Stark, Carroll, Ohio

Wage determination OH20260106 · Active · Standard · verify on SAM.gov

StarkCarroll

Get an email when this determination changes.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1)

Download CSV
ClassificationRateFringeTotal
LABORER: MASON TENDER - CEMENT/CONCRETE$29.55$10.90$40.45
ASBESTOS WORKER/HEAT & FROST INSULATOR$46.50$29.43$75.93
BRICKLAYER$35.59$22.71$58.30
TILE SETTER$33.46$21.37$54.83
TILE FINISHER$25.37$17.42$42.79
CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY)$33.09$23.06$56.15
ELECTRICIAN (LOW VOLTAGE WIRING ONLY)$25.15$17.44$42.59
ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING)$39.86$29.19$69.05
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$44.14$16.41$60.55
POWER EQUIPMENT OPERATOR: GRADER/BLADE$32.42$19.66$52.08
POWER EQUIPMENT OPERATOR: FORKLIFT$28.87$19.66$48.53
POWER EQUIPMENT OPERATOR (MECHANIC)$32.92$19.66$52.58
IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL$36.00$23.57$59.57
LABORER: MASON TENDER - BRICK$34.62$12.95$47.57
LABORER: COMMON OR GENERAL$32.62$12.95$45.57
PAINTER: BRUSH AND ROLLER$31.93$18.15$50.08
GLAZIER$32.87$15.17$48.04
PLUMBER (INCLUDES HVAC UNIT INSTALLATION)$47.48$27.14$74.62
PIPEFITTER (EXCLUDES HVAC UNIT INSTALLATION)$40.92$37.20$78.12
ROOFER$32.10$21.45$53.55
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)$37.66$32.23$69.89
TRUCK DRIVER: DUMP (ALL TYPES)$22.78$12.61$35.39
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION$34.16$0.00$34.16
PAINTER: SPRAY$22.78$12.40$35.18
OPERATOR: ROLLER$28.83$12.72$41.55
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$30.28$13.29$43.57
OPERATOR: LOADER$29.66$12.61$42.27
OPERATOR: CRANE$29.51$11.77$41.28
OPERATOR: BULLDOZER$22.55$8.03$30.58
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$30.26$12.58$42.84
LABORER: PIPELAYER$23.98$8.58$32.56
CEMENT MASON/CONCRETE FINISHER$26.07$12.34$38.41
CARPENTER, EXCLUDES DRYWALL HANGING, AND METAL STUD INSTALLATION$24.30$10.71$35.01
OPERATOR: OILER$27.56$16.37$43.93