Building construction wages: Stark, Carroll, Ohio
Wage determination OH20260106 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/OH20260106 on · latest revision 1 · verify at sam.gov/wage-determination/OH20260106/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: MASON TENDER - CEMENT/CONCRETE | $29.55 | $10.90 | $40.45 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $46.50 | $29.43 | $75.93 |
| BRICKLAYER | $35.59 | $22.71 | $58.30 |
| TILE SETTER | $33.46 | $21.37 | $54.83 |
| TILE FINISHER | $25.37 | $17.42 | $42.79 |
| CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | $33.09 | $23.06 | $56.15 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $25.15 | $17.44 | $42.59 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | $39.86 | $29.19 | $69.05 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $44.14 | $16.41 | $60.55 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $32.42 | $19.66 | $52.08 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $28.87 | $19.66 | $48.53 |
| POWER EQUIPMENT OPERATOR (MECHANIC) | $32.92 | $19.66 | $52.58 |
| IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL | $36.00 | $23.57 | $59.57 |
| LABORER: MASON TENDER - BRICK | $34.62 | $12.95 | $47.57 |
| LABORER: COMMON OR GENERAL | $32.62 | $12.95 | $45.57 |
| PAINTER: BRUSH AND ROLLER | $31.93 | $18.15 | $50.08 |
| GLAZIER | $32.87 | $15.17 | $48.04 |
| PLUMBER (INCLUDES HVAC UNIT INSTALLATION) | $47.48 | $27.14 | $74.62 |
| PIPEFITTER (EXCLUDES HVAC UNIT INSTALLATION) | $40.92 | $37.20 | $78.12 |
| ROOFER | $32.10 | $21.45 | $53.55 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $37.66 | $32.23 | $69.89 |
| TRUCK DRIVER: DUMP (ALL TYPES) | $22.78 | $12.61 | $35.39 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $34.16 | $0.00 | $34.16 |
| PAINTER: SPRAY | $22.78 | $12.40 | $35.18 |
| OPERATOR: ROLLER | $28.83 | $12.72 | $41.55 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $30.28 | $13.29 | $43.57 |
| OPERATOR: LOADER | $29.66 | $12.61 | $42.27 |
| OPERATOR: CRANE | $29.51 | $11.77 | $41.28 |
| OPERATOR: BULLDOZER | $22.55 | $8.03 | $30.58 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $30.26 | $12.58 | $42.84 |
| LABORER: PIPELAYER | $23.98 | $8.58 | $32.56 |
| CEMENT MASON/CONCRETE FINISHER | $26.07 | $12.34 | $38.41 |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND METAL STUD INSTALLATION | $24.30 | $10.71 | $35.01 |
| OPERATOR: OILER | $27.56 | $16.37 | $43.93 |