Building construction wages: Stark, Carroll, Ohio
Wage determination OH20260106 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/OH20260106 on · latest revision 1 · verify at sam.gov/wage-determination/OH20260106/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: MASON TENDER - CEMENT/CONCRETE | $29.55 | $10.90 | $40.45 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $46.50 | $29.43 | $75.93 |
| BRICKLAYER | $35.59 | $22.71 | $58.30 |
| TILE SETTER | $33.46 | $21.37 | $54.83 |
| TILE FINISHER | $25.37 | $17.42 | $42.79 |
| CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | $33.09 | $23.06 | $56.15 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $25.15 | $17.44 | $42.59 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | $39.86 | $29.19 | $69.05 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $44.14 | $16.41 | $60.55 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $32.42 | $19.66 | $52.08 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $28.87 | $19.66 | $48.53 |
| POWER EQUIPMENT OPERATOR (MECHANIC) | $32.92 | $19.66 | $52.58 |
| IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL | $36.00 | $23.57 | $59.57 |
| LABORER: MASON TENDER - BRICK | $34.62 | $12.95 | $47.57 |
| LABORER: COMMON OR GENERAL | $32.62 | $12.95 | $45.57 |
| PAINTER: BRUSH AND ROLLER | $31.93 | $18.15 | $50.08 |
| GLAZIER | $32.87 | $15.17 | $48.04 |
| PLUMBER (INCLUDES HVAC UNIT INSTALLATION) | $47.48 | $27.14 | $74.62 |
| PIPEFITTER (EXCLUDES HVAC UNIT INSTALLATION) | $40.92 | $37.20 | $78.12 |
| ROOFER | $32.10 | $21.45 | $53.55 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $37.66 | $32.23 | $69.89 |
| TRUCK DRIVER: DUMP (ALL TYPES) | $22.78 | $12.61 | $35.39 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $34.16 | $0.00 | $34.16 |
| PAINTER: SPRAY | $22.78 | $12.40 | $35.18 |
| OPERATOR: ROLLER | $28.83 | $12.72 | $41.55 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $30.28 | $13.29 | $43.57 |
| OPERATOR: LOADER | $29.66 | $12.61 | $42.27 |
| OPERATOR: CRANE | $29.51 | $11.77 | $41.28 |
| OPERATOR: BULLDOZER | $22.55 | $8.03 | $30.58 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $30.26 | $12.58 | $42.84 |
| LABORER: PIPELAYER | $23.98 | $8.58 | $32.56 |
| CEMENT MASON/CONCRETE FINISHER | $26.07 | $12.34 | $38.41 |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND METAL STUD INSTALLATION | $24.30 | $10.71 | $35.01 |
| OPERATOR: OILER | $27.56 | $16.37 | $43.93 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.