Building construction wages: Stark, Carroll, Ohio

Wage determination OH20260106 · Active · Standard · verify on SAM.gov

StarkCarroll

Get an email when this determination changes.This determination changed once in the last 12 months, most recently 2026-05-18: 2 added, 2 removed.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1)

Download CSV

The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.

ClassificationRateFringeTotal
LABORER: MASON TENDER - CEMENT/CONCRETE$29.55$10.90$40.45
ASBESTOS WORKER/HEAT & FROST INSULATOR$46.50$29.43$75.93
BRICKLAYER$35.59$22.71$58.30
TILE SETTER$33.46$21.37$54.83
TILE FINISHER$25.37$17.42$42.79
CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY)$33.09$23.06$56.15
ELECTRICIAN (LOW VOLTAGE WIRING ONLY)$25.15$17.44$42.59
ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING)$39.86$29.19$69.05
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$44.14$16.41$60.55
POWER EQUIPMENT OPERATOR: GRADER/BLADE$32.42$19.66$52.08
POWER EQUIPMENT OPERATOR: FORKLIFT$28.87$19.66$48.53
POWER EQUIPMENT OPERATOR (MECHANIC)$32.92$19.66$52.58
IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL$36.00$23.57$59.57
LABORER: MASON TENDER - BRICK$34.62$12.95$47.57
LABORER: COMMON OR GENERAL$32.62$12.95$45.57
PAINTER: BRUSH AND ROLLER$31.93$18.15$50.08
GLAZIER$32.87$15.17$48.04
PLUMBER (INCLUDES HVAC UNIT INSTALLATION)$47.48$27.14$74.62
PIPEFITTER (EXCLUDES HVAC UNIT INSTALLATION)$40.92$37.20$78.12
ROOFER$32.10$21.45$53.55
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)$37.66$32.23$69.89
TRUCK DRIVER: DUMP (ALL TYPES)$22.78$12.61$35.39
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION$34.16$0.00$34.16
PAINTER: SPRAY$22.78$12.40$35.18
OPERATOR: ROLLER$28.83$12.72$41.55
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$30.28$13.29$43.57
OPERATOR: LOADER$29.66$12.61$42.27
OPERATOR: CRANE$29.51$11.77$41.28
OPERATOR: BULLDOZER$22.55$8.03$30.58
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$30.26$12.58$42.84
LABORER: PIPELAYER$23.98$8.58$32.56
CEMENT MASON/CONCRETE FINISHER$26.07$12.34$38.41
CARPENTER, EXCLUDES DRYWALL HANGING, AND METAL STUD INSTALLATION$24.30$10.71$35.01
OPERATOR: OILER$27.56$16.37$43.93