Building construction wages: Wood, Ohio
Wage determination OH20260105 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/OH20260105 on · latest revision 1 · verify at sam.gov/wage-determination/OH20260105/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $37.00 | $28.27 | $65.27 |
| TILE FINISHER | $30.78 | $23.04 | $53.82 |
| TILE SETTER | $36.53 | $24.03 | $60.56 |
| TERRAZZO WORKER/SETTER | $36.53 | $24.03 | $60.56 |
| BRICKLAYER | $36.53 | $24.03 | $60.56 |
| CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | $28.22 | $17.77 | $45.99 |
| CARPENTER (EXCLUDING DRYWALL HANGING AND METAL STUD INSTALLATION) | $34.42 | $26.53 | $60.95 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | $48.40 | $25.24 | $73.64 |
| ELECTRICIAN: CABLE PULLER (VOICE/DATA/VIDEO) | $13.02 | $14.78 | $27.80 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $27.81 | $17.48 | $45.29 |
| POWER EQUIPMENT OPERATOR (BACKHOE/EXCAVATOR/TRACKHOE; CRANE) | $44.89 | $16.41 | $61.30 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $32.42 | $19.66 | $52.08 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $28.87 | $19.66 | $48.53 |
| POWER EQUIPMENT OPERATOR (MECHANIC) | $32.92 | $19.66 | $52.58 |
| IRONWORKER: ORNAMENTAL | $37.77 | $23.90 | $61.67 |
| IRONWORKER, STRUCTURAL (INCLUDING METAL BUILDING STRUCTURAL FRAME INSTALLATION) | $35.50 | $29.20 | $64.70 |
| LABORER: COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE | $32.35 | $16.42 | $48.77 |
| GLAZIER | $36.50 | $25.06 | $61.56 |
| CEMENT MASON/CONCRETE FINISHER | $35.73 | $24.65 | $60.38 |
| PLASTERER | $36.65 | $25.60 | $62.25 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $51.00 | $32.56 | $83.56 |
| PIPEFITTER (EXCLUDES HVAC PIPE INSTALLATION) | $51.00 | $32.56 | $83.56 |
| PLUMBER (EXCLUDES HVAC PIPE INSTALLATION) | $51.00 | $32.56 | $83.56 |
| ROOFER | $29.07 | $19.84 | $48.91 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $48.28 | $28.08 | $76.36 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $39.58 | $35.15 | $74.73 |
| SHEET METAL WORKER (EXCLUDING HVAC DUCT INSTALLATION) | $39.58 | $35.15 | $74.73 |
| TRUCK DRIVER: DUMP (ALL TYPES) | $24.32 | $11.73 | $36.05 |
| OPERATOR: ROLLER | $28.83 | $12.72 | $41.55 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $30.28 | $13.29 | $43.57 |
| OPERATOR: LOADER | $29.66 | $12.61 | $42.27 |
| OPERATOR: BULLDOZER | $28.07 | $11.15 | $39.22 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $30.26 | $12.58 | $42.84 |
| LABORER: PIPELAYER | $23.98 | $8.58 | $32.56 |
| LABORER: MASON TENDER - BRICK | $18.39 | $11.04 | $29.43 |
| IRONWORKER, REINFORCING | $28.11 | $17.83 | $45.94 |
| DRYWALL FINISHER/TAPER | $20.77 | $7.52 | $28.29 |
| OPERATOR: OILER | $27.56 | $16.37 | $43.93 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.