Building construction wages: Richland, Ohio
Wage determination OH20260099 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/OH20260099 on · latest revision 1 · verify at sam.gov/wage-determination/OH20260099/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $35.23 | $23.04 | $58.27 |
| BRICKLAYER | $35.67 | $24.75 | $60.42 |
| TILE FINISHER | $30.25 | $23.93 | $54.18 |
| TILE SETTER | $35.67 | $24.75 | $60.42 |
| CARPENTER (SOFT FLOOR LAYER AND FLOOR LAYING - HARDWOOD FLOORS ONLY) | $35.94 | $23.59 | $59.53 |
| ELECTRICIAN (HVAC/TEMPERATURE CONTROLS INSTALLATION ONLY) | $46.63 | $24.92 | $71.55 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $43.00 | $26.37 | $69.37 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF HVAC/TEMPERATURE CONTROLS) | $32.30 | $21.83 | $54.13 |
| ELEVATOR MECHANIC PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | $57.33 | $38.44 | $95.77 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $44.02 | $16.41 | $60.43 |
| POWER EQUIPMENT OPERATOR (OILER) | $36.34 | $16.41 | $52.75 |
| POWER EQUIPMENT OPERATOR (BOBCAT/SKID STEER/SKID LOADER; CONCRETE PUMP; CRANE) | $44.14 | $16.41 | $60.55 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $32.42 | $19.66 | $52.08 |
| POWER EQUIPMENT OPERATOR (MECHANIC) | $32.92 | $19.66 | $52.58 |
| IRONWORKER, REINFORCING | $40.87 | $23.15 | $64.02 |
| IRONWORKER: ORNAMENTAL AND STRUCTURAL | $36.00 | $23.57 | $59.57 |
| LABORER (MASON TENDER - BRICK & CEMENT/CONCRETE) | $32.10 | $14.20 | $46.30 |
| LABORER: COMMON OR GENERAL | $32.62 | $13.95 | $46.57 |
| PAINTER (SPRAY) | $29.70 | $14.91 | $44.61 |
| PIPEFITTER | $53.00 | $27.59 | $80.59 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $48.28 | $28.08 | $76.36 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT AND UNIT INSTALLATION) | $33.53 | $26.36 | $59.89 |
| TRUCK DRIVER: DUMP (ALL TYPES) | $24.32 | $11.73 | $36.05 |
| SHEET METAL WORKER (HVAC DUCT AND HVAC UNIT INSTALLATION ONLY) | $26.26 | $15.77 | $42.03 |
| ROOFER | $25.24 | $11.38 | $36.62 |
| PLUMBER | $25.28 | $6.87 | $32.15 |
| PAINTER (BRUSH AND ROLLER) | $23.87 | $9.42 | $33.29 |
| OPERATOR: ROLLER | $28.83 | $12.72 | $41.55 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $30.28 | $13.29 | $43.57 |
| OPERATOR: LOADER | $29.66 | $12.61 | $42.27 |
| OPERATOR: FORKLIFT | $22.79 | $12.76 | $35.55 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $27.26 | $9.80 | $37.06 |
| LABORER: PIPELAYER | $23.98 | $8.58 | $32.56 |
| LABORER: LANDSCAPE & IRRIGATION | $13.74 | $0.00 | $13.74 |
| GLAZIER | $22.60 | $11.02 | $33.62 |
| DRYWALL HANGER AND METAL STUD INSTALLER | $21.15 | $3.75 | $24.90 |
| DRYWALL FINISHER/TAPER | $20.44 | $4.75 | $25.19 |
| CEMENT MASON/CONCRETE FINISHER | $26.07 | $12.34 | $38.41 |
| CARPENTER (EXCLUDING ACOUSTICAL CEILING INSTALLATION, FLOOR LAYING - HARDWOOD FLOORS, AND SOFT FLOOR LAYING) | $23.42 | $11.05 | $34.47 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $24.17 | $8.61 | $32.78 |
| ABATEMENT WORKER: ASBESTOS (REMOVAL FROM CEILINGS, FLOORS, AND WALLS) | $22.74 | $9.25 | $31.99 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.