Building construction wages: Pickaway, Ohio
Wage determination OH20260096 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/OH20260096 on · latest revision 1 · verify at sam.gov/wage-determination/OH20260096/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $35.23 | $23.04 | $58.27 |
| TILE SETTER | $29.92 | $16.77 | $46.69 |
| TILE FINISHER | $28.31 | $10.45 | $38.76 |
| CARPENTER (SOFT FLOOR LAYER AND FLOOR LAYING - HARDWOOD FLOORS ONLY) | $35.94 | $23.59 | $59.53 |
| ELECTRICIAN (HVAC/TEMPERATURE CONTROLS INSTALLATION ONLY) | $46.63 | $24.92 | $71.55 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $43.00 | $26.37 | $69.37 |
| ELECTRICIAN (EXCLUDES INSTALLATION OF HVAC/TEMPERATURE CONTROLS AND LOW VOLTAGE WIRING) | $43.00 | $26.37 | $69.37 |
| ELEVATOR MECHANIC PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | $57.33 | $38.44 | $95.77 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $44.02 | $16.41 | $60.43 |
| POWER EQUIPMENT OPERATOR (OILER) | $36.34 | $16.41 | $52.75 |
| POWER EQUIPMENT OPERATOR (BOBCAT/SKID STEER/SKID LOADER; CONCRETE PUMP; CRANE) | $44.14 | $16.41 | $60.55 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $32.42 | $19.66 | $52.08 |
| POWER EQUIPMENT OPERATOR (MECHANIC) | $32.92 | $19.66 | $52.58 |
| IRONWORKER, REINFORCING | $40.87 | $23.15 | $64.02 |
| IRONWORKER: ORNAMENTAL | $36.00 | $23.57 | $59.57 |
| LABORER (MASON TENDER - BRICK & CEMENT/CONCRETE) | $32.10 | $14.20 | $46.30 |
| PAINTER (SPRAY) | $29.70 | $14.91 | $44.61 |
| PIPEFITTER | $53.00 | $27.59 | $80.59 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $48.28 | $28.08 | $76.36 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT AND UNIT INSTALLATION) | $33.53 | $26.36 | $59.89 |
| TRUCK DRIVER: DUMP (ALL TYPES) | $24.32 | $11.73 | $36.05 |
| SHEET METAL WORKER (HVAC DUCT AND HVAC UNIT INSTALLATION ONLY) | $26.26 | $15.77 | $42.03 |
| ROOFER | $25.24 | $11.38 | $36.62 |
| PLUMBER | $25.28 | $6.87 | $32.15 |
| PAINTER (BRUSH AND ROLLER) | $23.87 | $9.42 | $33.29 |
| OPERATOR: ROLLER | $28.83 | $12.72 | $41.55 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $30.28 | $13.29 | $43.57 |
| OPERATOR: LOADER | $29.66 | $12.61 | $42.27 |
| OPERATOR: FORKLIFT | $22.79 | $12.76 | $35.55 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $27.26 | $9.80 | $37.06 |
| LABORER: PIPELAYER | $23.98 | $8.58 | $32.56 |
| LABORER: LANDSCAPE & IRRIGATION | $13.74 | $0.00 | $13.74 |
| LABORER: COMMON OR GENERAL | $21.27 | $6.67 | $27.94 |
| IRONWORKER, STRUCTURAL | $26.52 | $16.23 | $42.75 |
| GLAZIER | $22.60 | $11.02 | $33.62 |
| DRYWALL HANGER AND METAL STUD INSTALLER | $21.15 | $3.75 | $24.90 |
| DRYWALL FINISHER/TAPER | $20.44 | $4.75 | $25.19 |
| CEMENT MASON/CONCRETE FINISHER | $26.07 | $12.34 | $38.41 |
| CARPENTER (EXCLUDING ACOUSTICAL CEILING INSTALLATION, FLOOR LAYING - HARDWOOD FLOOR, AND SOFT FLOOR LAYING) | $25.00 | $0.00 | $25.00 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $24.17 | $8.61 | $32.78 |
| BRICKLAYER | $20.00 | $1.60 | $21.60 |
| ABATEMENT WORKER: ASBESTOS (REMOVAL FROM CEILINGS, FLOORS, AND WALLS) | $22.74 | $9.25 | $31.99 |