Building construction wages: Miami, Ohio
Wage determination OH20260092 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/OH20260092 on · latest revision 1 · verify at sam.gov/wage-determination/OH20260092/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $35.23 | $23.04 | $58.27 |
| BRICKLAYER | $33.30 | $18.28 | $51.58 |
| TILE SETTER | $30.98 | $15.82 | $46.80 |
| TILE FINISHER | $28.28 | $11.05 | $39.33 |
| ELECTRICIAN | $38.00 | $22.49 | $60.49 |
| ELEVATOR MECHANIC PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | $57.41 | $38.44 | $95.85 |
| POWER EQUIPMENT OPERATOR: CRANE | $44.14 | $16.41 | $60.55 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $32.42 | $19.66 | $52.08 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $28.87 | $19.66 | $48.53 |
| POWER EQUIPMENT OPERATOR (MECHANIC) | $32.92 | $19.66 | $52.58 |
| IRONWORKER: ORNAMENTAL | $37.77 | $23.90 | $61.67 |
| IRONWORKER (REINFORCING AND STRUCTURAL) | $37.39 | $25.35 | $62.74 |
| LABORER: MASON TENDER - BRICK | $32.25 | $12.95 | $45.20 |
| LABORER (ASBESTOS ABATEMENT (REMOVAL FROM CEILINGS, FLOORS, AND WALLS)) | $31.65 | $12.95 | $44.60 |
| PAINTER: BRUSH AND ROLLER | $29.15 | $13.97 | $43.12 |
| GLAZIER | $31.95 | $18.20 | $50.15 |
| PIPEFITTER (EXCLUDES HVAC PIPE INSTALLATION) | $51.00 | $32.56 | $83.56 |
| PLUMBER (INCLUDES HVAC PIPE INSTALLATION) | $43.05 | $27.18 | $70.23 |
| ROOFER | $34.38 | $19.94 | $54.32 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $48.28 | $28.08 | $76.36 |
| TRUCK DRIVER: DUMP (ALL TYPES) | $22.08 | $11.51 | $33.59 |
| SHEET METAL WORKER (HVAC DUCT AND HVAC UNIT INSTALLATION ONLY) | $24.11 | $12.98 | $37.09 |
| PAINTER: SPRAY | $22.78 | $12.40 | $35.18 |
| OPERATOR: ROLLER | $28.25 | $12.61 | $40.86 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $30.28 | $13.29 | $43.57 |
| OPERATOR: LOADER | $29.99 | $12.80 | $42.79 |
| OPERATOR: BULLDOZER | $26.01 | $4.95 | $30.96 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $30.26 | $12.58 | $42.84 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $31.97 | $9.08 | $41.05 |
| LABORER: PIPELAYER | $23.98 | $8.58 | $32.56 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $22.95 | $8.60 | $31.55 |
| LABORER: COMMON OR GENERAL | $19.55 | $6.44 | $25.99 |
| FORM WORKER | $22.41 | $9.01 | $31.42 |
| DRYWALL HANGER AND METAL STUD INSTALLER | $21.02 | $4.21 | $25.23 |
| CEMENT MASON/CONCRETE FINISHER | $26.07 | $12.34 | $38.41 |
| CARPENTER | $21.80 | $7.13 | $28.93 |
| OPERATOR: OILER | $27.56 | $16.37 | $43.93 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $28.10 | $23.41 | $51.51 |