Building construction wages: Licking, Ohio

Wage determination OH20260086 · Active · Standard · verify on SAM.gov

Licking

Get an email when this determination changes.This determination changed once in the last 12 months, most recently 2026-05-18: 1 rate change (PIPEFITTER $43.25 → $53.00).
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1)

Download CSV

The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.

ClassificationRateFringeTotal
ASBESTOS WORKER/HEAT & FROST INSULATOR$35.23$23.04$58.27
BRICKLAYER$33.24$19.62$52.86
TILE SETTER$29.92$16.77$46.69
TILE FINISHER$28.31$10.45$38.76
CARPENTER (SOFT FLOOR LAYER AND FLOOR LAYING - HARDWOOD FLOORS ONLY)$35.94$23.59$59.53
ELECTRICIAN (HVAC/TEMPERATURE CONTROLS INSTALLATION ONLY)$46.63$24.92$71.55
ELECTRICIAN (LOW VOLTAGE WIRING ONLY)$43.00$26.37$69.37
ELEVATOR MECHANIC PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE$57.33$38.44$95.77
POWER EQUIPMENT OPERATOR: BULLDOZER$44.02$16.41$60.43
POWER EQUIPMENT OPERATOR (OILER)$36.34$16.41$52.75
POWER EQUIPMENT OPERATOR (BOBCAT/SKID STEER/SKID LOADER; CONCRETE PUMP; CRANE)$44.14$16.41$60.55
POWER EQUIPMENT OPERATOR: GRADER/BLADE$32.42$19.66$52.08
POWER EQUIPMENT OPERATOR (MECHANIC)$32.92$19.66$52.58
IRONWORKER, REINFORCING$40.87$23.15$64.02
IRONWORKER: ORNAMENTAL$36.00$23.57$59.57
LABORER (MASON TENDER - BRICK & CEMENT/CONCRETE)$32.10$14.20$46.30
PAINTER (SPRAY)$29.70$14.91$44.61
PIPEFITTER$53.00$27.59$80.59
SPRINKLER FITTER (FIRE SPRINKLERS)$48.28$28.08$76.36
SHEET METAL WORKER (EXCLUDES HVAC DUCT AND UNIT INSTALLATION)$33.53$26.36$59.89
TRUCK DRIVER: DUMP (ALL TYPES)$24.32$11.73$36.05
SHEET METAL WORKER (HVAC DUCT AND HVAC UNIT INSTALLATION ONLY)$26.26$15.77$42.03
ROOFER$25.24$11.38$36.62
PLUMBER$25.28$6.87$32.15
PAINTER (BRUSH AND ROLLER)$23.87$9.42$33.29
OPERATOR: ROLLER$28.83$12.72$41.55
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$30.28$13.29$43.57
OPERATOR: LOADER$29.66$12.61$42.27
OPERATOR: FORKLIFT$22.79$12.76$35.55
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$27.26$9.80$37.06
LABORER: PIPELAYER$23.98$8.58$32.56
LABORER: LANDSCAPE & IRRIGATION$13.74$0.00$13.74
LABORER: COMMON OR GENERAL$13.00$1.71$14.71
IRONWORKER, STRUCTURAL$26.52$16.23$42.75
GLAZIER$22.60$11.02$33.62
ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF HVAC/TEMPERATURE CONTROLS$25.34$11.24$36.58
DRYWALL HANGER AND METAL STUD INSTALLER$21.15$3.75$24.90
DRYWALL FINISHER/TAPER$20.44$4.75$25.19
CEMENT MASON/CONCRETE FINISHER$26.07$12.34$38.41
CARPENTER (EXCLUDING ACOUSTICAL CEILING INSTALLATION, FLOOR LAYING - HARDWOOD FLOORS, AND SOFT FLOOR LAYING)$15.50$0.00$15.50
CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY)$24.17$8.61$32.78
ABATEMENT WORKER: ASBESTOS (REMOVAL FROM CEILINGS, FLOORS, AND WALLS)$22.74$9.25$31.99

Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.