Building construction wages: Butler, Ohio
Wage determination OH20260071 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/OH20260071 on · latest revision 1 · verify at sam.gov/wage-determination/OH20260071/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $35.23 | $23.04 | $58.27 |
| TILE SETTER | $32.41 | $16.36 | $48.77 |
| TILE FINISHER | $27.87 | $16.31 | $44.18 |
| CARPENTER (ACCOUSTICAL CEILING INSTALLATION ONLY) | $32.26 | $19.10 | $51.36 |
| CARPENTER (INCLUDES DRYWALL HANGING AND METAL STUD INSTALLATION; EXCLUDES FORM WORK) | $32.26 | $19.10 | $51.36 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | $38.00 | $24.16 | $62.16 |
| ELEVATOR MECHANIC PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | $57.41 | $38.44 | $95.85 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $44.14 | $16.41 | $60.55 |
| POWER EQUIPMENT OPERATOR: BULLDOZER; CRANE | $44.14 | $16.41 | $60.55 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $32.42 | $19.66 | $52.08 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $28.87 | $19.66 | $48.53 |
| POWER EQUIPMENT OPERATOR (MECHANIC) | $32.92 | $19.66 | $52.58 |
| IRONWORKER, REINFORCING | $38.27 | $23.90 | $62.17 |
| IRONWORKER: ORNAMENTAL AND STRUCTURAL | $37.77 | $23.90 | $61.67 |
| LABORER: MASON TENDER - BRICK | $32.82 | $14.45 | $47.27 |
| LABORER: COMMON OR GENERAL; FORM WORK | $32.49 | $14.45 | $46.94 |
| PAINTER: BRUSH AND ROLLER | $28.29 | $13.75 | $42.04 |
| GLAZIER | $31.95 | $18.20 | $50.15 |
| PLASTERER | $31.35 | $17.65 | $49.00 |
| PLUMBER (INCLUDES HVAC UNIT INSTALLATION, EXCLUDES HVAC PIPE INSTALLATION) | $43.30 | $27.40 | $70.70 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION, EXCLUDES HVAC UNIT INSTALLATION) | $43.30 | $27.40 | $70.70 |
| ROOFER | $34.38 | $19.94 | $54.32 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $48.28 | $28.08 | $76.36 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $31.23 | $25.79 | $57.02 |
| SHEET METAL WORKER (EXCLUDING HVAC DUCT INSTALLATION) | $34.32 | $23.77 | $58.09 |
| TRUCK DRIVER: DUMP (ALL TYPES) | $24.32 | $11.73 | $36.05 |
| PAINTER: SPRAY | $22.78 | $12.40 | $35.18 |
| OPERATOR: ROLLER | $29.85 | $12.00 | $41.85 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $30.28 | $13.29 | $43.57 |
| OPERATOR: LOADER | $29.66 | $12.61 | $42.27 |
| LABORER: PIPELAYER | $23.18 | $8.95 | $32.13 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $23.87 | $9.80 | $33.67 |
| LABORER: LANDSCAPE & IRRIGATION | $23.60 | $0.87 | $24.47 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $26.19 | $8.99 | $35.18 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $22.62 | $8.76 | $31.38 |
| CEMENT MASON/CONCRETE FINISHER | $32.38 | $2.58 | $34.96 |
| BRICKLAYER | $24.73 | $4.71 | $29.44 |
| OPERATOR: OILER | $27.56 | $16.37 | $43.93 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $36.89 | $14.79 | $51.68 |