Building construction wages: Butler, Ohio
Wage determination OH20260071 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/OH20260071 on · latest revision 1 · verify at sam.gov/wage-determination/OH20260071/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $35.23 | $23.04 | $58.27 |
| TILE SETTER | $32.41 | $16.36 | $48.77 |
| TILE FINISHER | $27.87 | $16.31 | $44.18 |
| CARPENTER (ACCOUSTICAL CEILING INSTALLATION ONLY) | $32.26 | $19.10 | $51.36 |
| CARPENTER (INCLUDES DRYWALL HANGING AND METAL STUD INSTALLATION; EXCLUDES FORM WORK) | $32.26 | $19.10 | $51.36 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | $38.00 | $24.16 | $62.16 |
| ELEVATOR MECHANIC PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | $57.41 | $38.44 | $95.85 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $44.14 | $16.41 | $60.55 |
| POWER EQUIPMENT OPERATOR: BULLDOZER; CRANE | $44.14 | $16.41 | $60.55 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $32.42 | $19.66 | $52.08 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $28.87 | $19.66 | $48.53 |
| POWER EQUIPMENT OPERATOR (MECHANIC) | $32.92 | $19.66 | $52.58 |
| IRONWORKER, REINFORCING | $38.27 | $23.90 | $62.17 |
| IRONWORKER: ORNAMENTAL AND STRUCTURAL | $37.77 | $23.90 | $61.67 |
| LABORER: MASON TENDER - BRICK | $32.82 | $14.45 | $47.27 |
| LABORER: COMMON OR GENERAL; FORM WORK | $32.49 | $14.45 | $46.94 |
| PAINTER: BRUSH AND ROLLER | $28.29 | $13.75 | $42.04 |
| GLAZIER | $31.95 | $18.20 | $50.15 |
| PLASTERER | $31.35 | $17.65 | $49.00 |
| PLUMBER (INCLUDES HVAC UNIT INSTALLATION, EXCLUDES HVAC PIPE INSTALLATION) | $43.30 | $27.40 | $70.70 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION, EXCLUDES HVAC UNIT INSTALLATION) | $43.30 | $27.40 | $70.70 |
| ROOFER | $34.38 | $19.94 | $54.32 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $48.28 | $28.08 | $76.36 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $31.23 | $25.79 | $57.02 |
| SHEET METAL WORKER (EXCLUDING HVAC DUCT INSTALLATION) | $34.32 | $23.77 | $58.09 |
| TRUCK DRIVER: DUMP (ALL TYPES) | $24.32 | $11.73 | $36.05 |
| PAINTER: SPRAY | $22.78 | $12.40 | $35.18 |
| OPERATOR: ROLLER | $29.85 | $12.00 | $41.85 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $30.28 | $13.29 | $43.57 |
| OPERATOR: LOADER | $29.66 | $12.61 | $42.27 |
| LABORER: PIPELAYER | $23.18 | $8.95 | $32.13 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $23.87 | $9.80 | $33.67 |
| LABORER: LANDSCAPE & IRRIGATION | $23.60 | $0.87 | $24.47 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $26.19 | $8.99 | $35.18 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $22.62 | $8.76 | $31.38 |
| CEMENT MASON/CONCRETE FINISHER | $32.38 | $2.58 | $34.96 |
| BRICKLAYER | $24.73 | $4.71 | $29.44 |
| OPERATOR: OILER | $27.56 | $16.37 | $43.93 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $36.89 | $14.79 | $51.68 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.