Building construction wages: Belmont, Ohio
Wage determination OH20260069 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/OH20260069 on · latest revision 1 · verify at sam.gov/wage-determination/OH20260069/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $35.23 | $23.04 | $58.27 |
| TILE SETTER | $33.46 | $21.37 | $54.83 |
| TILE FINISHER | $25.37 | $17.42 | $42.79 |
| BRICKLAYER | $30.55 | $26.41 | $56.96 |
| CARPENTER | $31.82 | $25.07 | $56.89 |
| ELECTRICIAN | $39.25 | $31.23 | $70.48 |
| POWER EQUIPMENT OPERATOR (BACKHOE/EXCAVATOR/TRACKHOE; BULLDOZER; CRANE) | $44.14 | $16.41 | $60.55 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $32.42 | $19.66 | $52.08 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $28.87 | $19.66 | $48.53 |
| POWER EQUIPMENT OPERATOR (MECHANIC) | $32.92 | $19.66 | $52.58 |
| IRONWORKER (METAL BUILDING STRUCTURAL FRAME INSTALLATION ONLY) | $35.19 | $25.66 | $60.85 |
| IRONWORKER, STRUCTURAL (EXCLUDING METAL BUILDING STRUCTURAL FRAME INSTALLATION) | $35.19 | $25.66 | $60.85 |
| IRONWORKER: ORNAMENTAL | $36.00 | $23.57 | $59.57 |
| LABORER: COMMON OR GENERAL; MASON TENDER - BRICK | $24.92 | $16.55 | $41.47 |
| PLUMBER (EXCLUDES HVAC PIPE INSTALLATION) | $47.48 | $27.14 | $74.62 |
| PIPEFITTER (EXCLUDES HVAC PIPE INSTALLATION) | $40.92 | $37.20 | $78.12 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $34.73 | $37.60 | $72.33 |
| ROOFER | $32.10 | $21.45 | $53.55 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT AND UNIT INSTALLATION) | $35.52 | $29.87 | $65.39 |
| TRUCK DRIVER: DUMP (ALL TYPES) | $22.78 | $12.61 | $35.39 |
| PAINTER: SPRAY | $22.78 | $12.40 | $35.18 |
| PAINTER (BRUSH AND ROLLER) | $20.37 | $10.63 | $31.00 |
| OPERATOR: ROLLER | $28.83 | $12.72 | $41.55 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $30.28 | $13.29 | $43.57 |
| OPERATOR: LOADER | $29.66 | $12.61 | $42.27 |
| OPERATOR: CRANE | $29.56 | $11.82 | $41.38 |
| OPERATOR: BULLDOZER | $22.55 | $8.03 | $30.58 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $30.26 | $12.58 | $42.84 |
| LABORER: PIPELAYER | $23.98 | $8.58 | $32.56 |
| CEMENT MASON/CONCRETE FINISHER | $26.07 | $12.34 | $38.41 |
| OPERATOR: OILER | $27.56 | $16.37 | $43.93 |
| IRONWORKER: REINFORCING | $29.81 | $20.72 | $50.53 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $29.55 | $10.90 | $40.45 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.