Building construction wages: Allen, Ohio
Wage determination OH20260068 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/OH20260068 on · latest revision 1 · verify at sam.gov/wage-determination/OH20260068/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $35.23 | $23.04 | $58.27 |
| TILE SETTER | $29.69 | $16.58 | $46.27 |
| TILE FINISHER | $24.87 | $10.66 | $35.53 |
| BRICKLAYER | $34.12 | $18.95 | $53.07 |
| ELECTRICIAN | $38.00 | $22.49 | $60.49 |
| POWER EQUIPMENT OPERATOR: CRANE | $44.14 | $16.41 | $60.55 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $32.42 | $19.66 | $52.08 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $28.87 | $19.66 | $48.53 |
| POWER EQUIPMENT OPERATOR (MECHANIC) | $32.92 | $19.66 | $52.58 |
| IRONWORKER: ORNAMENTAL | $37.77 | $23.90 | $61.67 |
| IRONWORKER, REINFORCING | $37.39 | $25.35 | $62.74 |
| LABORER: COMMON OR GENERAL | $32.41 | $12.95 | $45.36 |
| LABORER: MASON TENDER - BRICK | $32.25 | $12.95 | $45.20 |
| CEMENT MASON/CONCRETE FINISHER | $35.73 | $24.65 | $60.38 |
| PIPEFITTER | $51.00 | $32.56 | $83.56 |
| PLUMBER | $42.76 | $30.81 | $73.57 |
| ROOFER | $29.07 | $19.84 | $48.91 |
| SHEET METAL WORKER | $31.23 | $25.79 | $57.02 |
| TRUCK DRIVER: DUMP (ALL TYPES) | $22.08 | $11.51 | $33.59 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $25.44 | $11.11 | $36.55 |
| PAINTER: SPRAY | $22.78 | $12.40 | $35.18 |
| PAINTER (BRUSH AND ROLLER) | $24.54 | $1.25 | $25.79 |
| OPERATOR: ROLLER | $28.25 | $12.61 | $40.86 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $30.28 | $13.29 | $43.57 |
| OPERATOR: LOADER | $29.87 | $10.91 | $40.78 |
| OPERATOR: BULLDOZER | $26.01 | $4.95 | $30.96 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $30.26 | $12.58 | $42.84 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $29.73 | $8.29 | $38.02 |
| LABORER: PIPELAYER | $23.98 | $8.58 | $32.56 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $22.95 | $8.60 | $31.55 |
| IRONWORKER, STRUCTURAL | $22.38 | $6.14 | $28.52 |
| HVAC MECHANIC: DUCT INSTALLATION | $19.57 | $0.00 | $19.57 |
| DRYWALL FINISHER/TAPER | $20.48 | $5.44 | $25.92 |
| CARPENTER | $19.34 | $5.76 | $25.10 |
| OPERATOR: OILER | $27.56 | $16.37 | $43.93 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.