Building construction wages: Williams, Ohio
Wage determination OH20260062 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/OH20260062 on · latest revision 1 · verify at sam.gov/wage-determination/OH20260062/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $37.00 | $28.27 | $65.27 |
| BRICK POINTER/CAULKER/CLEANER | $33.30 | $18.28 | $51.58 |
| CARPENTER (EXCLUDING SOFT FLOOR LAYING) | $30.45 | $24.96 | $55.41 |
| SOFT FLOOR LAYER | $30.25 | $25.16 | $55.41 |
| ELECTRICIAN | $48.40 | $25.24 | $73.64 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $42.98 | $16.41 | $59.39 |
| POWER EQUIPMENT OPERATOR (BACKHOE/EXCAVATOR/TRACKHOE; CRANE; SCRAPER) | $44.14 | $16.41 | $60.55 |
| IRONWORKER, STRUCTURAL | $35.50 | $29.20 | $64.70 |
| IRONWORKER: ORNAMENTAL | $36.00 | $23.57 | $59.57 |
| LABORER (CHAIN LINK/CYCLONE FENCE ERECTION) | $28.73 | $11.80 | $40.53 |
| LABORER (MASON TENDER - CEMENT/CONCRETE) | $32.35 | $16.42 | $48.77 |
| GLAZIER | $36.50 | $25.06 | $61.56 |
| CEMENT MASON/CONCRETE FINISHER | $35.73 | $24.65 | $60.38 |
| PLUMBER (HVAC PIPE INSTALLATION ONLY) | $51.00 | $32.56 | $83.56 |
| PIPEFITTER (EXCLUDES HVAC PIPE INSTALLATION) | $51.00 | $32.56 | $83.56 |
| ROOFER | $29.07 | $19.84 | $48.91 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT AND UNIT INSTALLATION) | $39.58 | $35.15 | $74.73 |
| TRUCK DRIVER: DUMP (ALL TYPES) | $17.97 | $4.14 | $22.11 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $25.91 | $9.18 | $35.09 |
| SHEET METAL WORKER (HVAC DUCT AND HVAC UNIT INSTALLATION ONLY) | $22.05 | $12.18 | $34.23 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $29.57 | $17.20 | $46.77 |
| PAINTER (BRUSH AND ROLLER) | $17.91 | $10.85 | $28.76 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $25.85 | $10.42 | $36.27 |
| OPERATOR: LOADER | $17.43 | $2.72 | $20.15 |
| OPERATOR: BULLDOZER | $23.50 | $7.51 | $31.01 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.00 | $3.26 | $23.26 |
| LABORER: PIPELAYER | $18.37 | $4.79 | $23.16 |
| LABORER: MASON TENDER - BRICK | $22.74 | $8.60 | $31.34 |
| LABORER: LANDSCAPE & IRRIGATION | $10.39 | $0.00 | $10.39 |
| LABORER: COMMON OR GENERAL | $24.76 | $9.10 | $33.86 |
| DRYWALL HANGER AND METAL STUD INSTALLER | $17.63 | $5.64 | $23.27 |
| DRYWALL FINISHER/TAPER | $18.57 | $3.12 | $21.69 |
| BRICKLAYER | $27.47 | $12.26 | $39.73 |
| BRICKLAYER: TILE SETTER | $29.90 | $16.52 | $46.42 |
| BRICKLAYER: TILE FINISHER | $26.88 | $11.81 | $38.69 |
| IRONWORKER: REINFORCING | $33.18 | $23.73 | $56.91 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.