Building construction wages: Pike, Ohio
Wage determination OH20260051 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/OH20260051 on · latest revision 1 · verify at sam.gov/wage-determination/OH20260051/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $38.05 | $30.87 | $68.92 |
| BRICKLAYER | $34.00 | $17.36 | $51.36 |
| TILE SETTER | $29.92 | $16.77 | $46.69 |
| TILE FINISHER | $28.31 | $10.45 | $38.76 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS) | $37.00 | $22.26 | $59.26 |
| ELECTRICIAN (LOW VOLTAGE WIRING AND ALARM INSTALLATION ONLY) | $40.00 | $33.32 | $73.32 |
| ELEVATOR MECHANIC PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | $57.41 | $38.44 | $95.85 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $42.98 | $16.41 | $59.39 |
| POWER EQUIPMENT OPERATOR: CRANE | $44.14 | $16.41 | $60.55 |
| POWER EQUIPMENT OPERATOR (BOBCAT/SKID STEER/SKID LOADER; BULLDOZER) | $44.02 | $16.41 | $60.43 |
| IRONWORKER: ORNAMENTAL | $36.00 | $23.57 | $59.57 |
| IRONWORKER, STRUCTURAL | $39.70 | $29.59 | $69.29 |
| LABORER (COMMON OR GENERAL; MASON TENDER - BRICK & CEMENT/CONCRETE) | $40.97 | $14.10 | $55.07 |
| PAINTER: BRUSH AND ROLLER | $30.28 | $24.46 | $54.74 |
| GLAZIER | $32.89 | $14.33 | $47.22 |
| CEMENT MASON/CONCRETE FINISHER | $35.12 | $17.40 | $52.52 |
| PIPEFITTER (EXCLUDES HVAC PIPE INSTALLATION) | $38.89 | $28.56 | $67.45 |
| PLUMBER (INCLUDES HVAC PIPE INSTALLATION) | $38.89 | $28.56 | $67.45 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $48.28 | $28.08 | $76.36 |
| SHEET METAL WORKER (HVAC DUCT AND UNIT INSTALLATION ONLY) | $33.53 | $26.36 | $59.89 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT AND UNIT INSTALLATION) | $31.73 | $27.44 | $59.17 |
| TRUCK DRIVER: DUMP (ALL TYPES) | $19.33 | $6.55 | $25.88 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $23.91 | $10.42 | $34.33 |
| OPERATOR: LOADER | $22.69 | $8.01 | $30.70 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $29.18 | $10.69 | $39.87 |
| LABORER: PIPELAYER | $18.37 | $4.79 | $23.16 |
| DRYWALL HANGER AND METAL STUD INSTALLER | $22.27 | $14.40 | $36.67 |
| DRYWALL FINISHER/TAPER | $20.66 | $4.91 | $25.57 |
| CARPENTER | $25.80 | $12.54 | $38.34 |
| IRONWORKER: REINFORCING | $29.44 | $22.68 | $52.12 |
| ROOFER | $30.19 | $15.73 | $45.92 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.