Building construction wages: Defiance, Ohio

Wage determination OH20260039 · Active · Standard · verify on SAM.gov

Defiance

Get an email when this determination changes.This determination changed once in the last 12 months, most recently 2026-05-18: 1 rate change, 3 added, 3 removed (ELECTRICIAN $48.40 → $48.40).
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1)

Download CSV

The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.

ClassificationRateFringeTotal
ASBESTOS WORKER/HEAT & FROST INSULATOR$37.00$28.27$65.27
BRICKLAYER$36.36$21.55$57.91
BRICK POINTER/CAULKER/CLEANER$33.30$18.28$51.58
SOFT FLOOR LAYER$30.25$25.16$55.41
ELECTRICIAN$48.40$25.24$73.64
POWER EQUIPMENT OPERATOR: FORKLIFT$42.98$16.41$59.39
POWER EQUIPMENT OPERATOR (CRANE; SCRAPER)$44.14$16.41$60.55
IRONWORKER, STRUCTURAL$35.50$29.20$64.70
IRONWORKER: ORNAMENTAL$36.00$23.57$59.57
LABORER (CHAIN LINK/CYCLONE FENCE ERECTION)$28.73$11.80$40.53
LABORER: COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE$32.35$16.42$48.77
GLAZIER$36.50$25.06$61.56
PLUMBER (HVAC PIPE INSTALLATION ONLY)$51.00$32.56$83.56
PIPEFITTER (EXCLUDES HVAC PIPE INSTALLATION)$51.00$32.56$83.56
ROOFER$29.07$19.84$48.91
SHEET METAL WORKER (EXCLUDES HVAC DUCT AND UNIT INSTALLATION)$39.58$35.15$74.73
TRUCK DRIVER: DUMP (ALL TYPES)$17.97$4.14$22.11
SPRINKLER FITTER (FIRE SPRINKLERS)$25.91$9.18$35.09
SHEET METAL WORKER (HVAC DUCT AND HVAC UNIT INSTALLATION ONLY)$22.05$12.18$34.23
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION$29.57$17.20$46.77
PAINTER (BRUSH AND ROLLER)$17.91$10.85$28.76
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$25.85$10.42$36.27
OPERATOR: LOADER$17.43$2.72$20.15
OPERATOR: BULLDOZER$23.50$7.51$31.01
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$20.00$3.26$23.26
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$24.59$7.76$32.35
LABORER: PIPELAYER$18.37$4.79$23.16
LABORER: MASON TENDER - BRICK$22.74$8.60$31.34
LABORER: LANDSCAPE & IRRIGATION$10.39$0.00$10.39
DRYWALL HANGER AND METAL STUD INSTALLER$17.63$5.64$23.27
DRYWALL FINISHER/TAPER$18.57$3.12$21.69
CEMENT MASON/CONCRETE FINISHER$23.47$10.07$33.54
CARPENTER (EXCLUDING SOFT FLOOR LAYING)$19.12$5.32$24.44
BRICKLAYER: TILE SETTER$29.90$16.52$46.42
BRICKLAYER: TILE FINISHER$26.88$11.81$38.69
IRONWORKER: REINFORCING$33.18$23.73$56.91

Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.