Building construction wages: Ashtabula, Ohio
Wage determination OH20260032 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/OH20260032 on · latest revision 1 · verify at sam.gov/wage-determination/OH20260032/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $38.01 | $20.64 | $58.65 |
| BRICK POINTER/CAULKER/CLEANER | $26.20 | $13.89 | $40.09 |
| TILE SETTER | $36.07 | $19.49 | $55.56 |
| TILE FINISHER | $31.50 | $16.23 | $47.73 |
| BRICK POINTER/CAULKER/CLEANER | $26.20 | $13.89 | $40.09 |
| TILE SETTER | $36.07 | $19.49 | $55.56 |
| TILE FINISHER | $31.50 | $16.23 | $47.73 |
| SOFT FLOOR LAYER | $37.52 | $23.50 | $61.02 |
| CARPENTER (EXCLUDING DRYWALL HANGING, METAL STUD INSTALLATION, SOFT FLOOR LAYING, AND FORM WORK) | $37.52 | $23.50 | $61.02 |
| ELECTRICIAN (HVAC/TEMPERATURE CONTROLS INSTALLATION ONLY) | $46.63 | $24.92 | $71.55 |
| ELEVATOR MECHANIC PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | $57.33 | $38.44 | $95.77 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $42.98 | $16.41 | $59.39 |
| POWER EQUIPMENT OPERATOR: CRANE | $44.14 | $16.41 | $60.55 |
| IRONWORKER: ORNAMENTAL AND STRUCTURAL | $36.00 | $23.57 | $59.57 |
| LABORER: COMMON OR GENERAL | $37.70 | $15.95 | $53.65 |
| LABORER (MASON TENDER - CEMENT/CONCRETE) | $32.35 | $16.42 | $48.77 |
| PAINTER, DRYWALL TAPER (DRYWALL FINISHING/TAPING ONLY) | $33.43 | $18.15 | $51.58 |
| PLASTERER | $31.68 | $15.46 | $47.14 |
| PIPEFITTER (EXCLUDES HVAC PIPE INSTALLATION) | $51.00 | $32.56 | $83.56 |
| PLUMBER (EXCLUDES HVAC PIPE INSTALLATION) | $44.86 | $30.03 | $74.89 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $49.17 | $28.55 | $77.72 |
| ROOFER | $40.15 | $21.28 | $61.43 |
| SHEET METAL WORKER (EXCLUDING HVAC DUCT AND UNIT INSTALLATION) | $38.36 | $29.59 | $67.95 |
| TRUCK DRIVER: DUMP (ALL TYPES) | $18.88 | $4.14 | $23.02 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $28.89 | $10.53 | $39.42 |
| PAINTER (BRUSH AND ROLLER) | $20.91 | $10.49 | $31.40 |
| OPERATOR: ROLLER | $22.16 | $8.07 | $30.23 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $25.85 | $10.42 | $36.27 |
| OPERATOR: LOADER | $19.87 | $5.91 | $25.78 |
| OPERATOR: BULLDOZER | $24.19 | $8.24 | $32.43 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.56 | $7.13 | $27.69 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $30.20 | $12.96 | $43.16 |
| LABORER: PIPELAYER | $18.37 | $4.79 | $23.16 |
| ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF HVAC/TEMPERATURE CONTROLS | $29.72 | $15.79 | $45.51 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $20.91 | $8.20 | $29.11 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $36.16 | $26.11 | $62.27 |
| CARPENTER: PILEDRIVERMAN | $30.06 | $17.61 | $47.67 |
| CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | $25.49 | $15.67 | $41.16 |
| CEMENT MASON/CONCRETE FINISHER | $29.43 | $18.70 | $48.13 |
| IRONWORKER: REINFORCING | $33.44 | $23.55 | $56.99 |
| LABORER: MASON TENDER - BRICK | $27.81 | $11.24 | $39.05 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $31.53 | $26.35 | $57.88 |
| SHEET METAL WORKER (HVAC UNIT INSTALLATION ONLY) | $30.03 | $25.53 | $55.56 |