Building construction wages: Schuyler, New York
Wage determination NY20260114 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/NY20260114 on · latest revision 1 · verify at sam.gov/wage-determination/NY20260114/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TILE SETTER | $38.34 | $20.51 | $58.85 |
| CEMENT MASON/CONCRETE FINISHER | $32.53 | $22.10 | $54.63 |
| SOFT FLOOR LAYER | $25.61 | $17.40 | $43.01 |
| ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING) | $42.50 | $27.23 | $69.73 |
| IRONWORKER: ORNAMENTAL | $35.49 | $32.30 | $67.79 |
| IRONWORKER, STRUCTURAL | $35.49 | $32.30 | $67.79 |
| IRONWORKER, REINFORCING | $35.49 | $32.30 | $67.79 |
| PAINTER (SPRAY) | $28.35 | $25.21 | $53.56 |
| PAINTER: BRUSH AND ROLLER | $27.25 | $25.24 | $52.49 |
| PLUMBER | $42.20 | $29.80 | $72.00 |
| PIPEFITTER (INCLUDES HVAC UNIT INSTALLATION) | $37.47 | $27.40 | $64.87 |
| ROOFER | $36.70 | $18.00 | $54.70 |
| PAINTER: DRYWALL FINISHING/TAPING | $24.81 | $21.13 | $45.94 |
| OPERATOR: FORKLIFT | $32.70 | $24.12 | $56.82 |
| OPERATOR: CRANE | $36.52 | $26.91 | $63.43 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $41.10 | $19.26 | $60.36 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $43.97 | $24.17 | $68.14 |
| MILLWRIGHT | $27.08 | $19.72 | $46.80 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $23.84 | $14.18 | $38.02 |
| LABORER: COMMON OR GENERAL | $24.35 | $16.27 | $40.62 |
| INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $31.50 | $21.11 | $52.61 |
| INSTALLER: METAL STUDS | $26.70 | $17.40 | $44.10 |
| GLAZIER | $25.03 | $19.70 | $44.73 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $27.05 | $17.40 | $44.45 |
| CARPENTER (FORM WORK ONLY) | $25.84 | $17.56 | $43.40 |
| CARPENTER (DRYWALL HANGING ONLY) | $26.99 | $17.40 | $44.39 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $26.00 | $18.35 | $44.35 |
| BRICKLAYER | $31.61 | $24.98 | $56.59 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.