Building construction wages: Clinton, New York
Wage determination NY20260104 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/NY20260104 on · latest revision 1 · verify at sam.gov/wage-determination/NY20260104/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TILE SETTER | $38.34 | $20.51 | $58.85 |
| CEMENT MASON/CONCRETE FINISHER | $26.49 | $17.83 | $44.32 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $28.90 | $21.63 | $50.53 |
| CARPENTER (INCLUDES FORM WORK (EXCLUDES ACOUSTICAL CEILING INSTALLATION)) | $30.68 | $23.01 | $53.69 |
| MILLWRIGHT | $30.20 | $23.83 | $54.03 |
| ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING) | $43.50 | $28.38 | $71.88 |
| ELEVATOR MECHANIC | $57.73 | $38.44 | $96.17 |
| IRONWORKER: ORNAMENTAL | $35.49 | $32.30 | $67.79 |
| IRONWORKER, REINFORCING | $35.49 | $32.30 | $67.79 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $31.49 | $21.54 | $53.03 |
| LABORER (COMMON OR GENERAL) | $27.03 | $24.00 | $51.03 |
| PAINTER: SPRAY | $28.35 | $25.21 | $53.56 |
| PAINTER (BRUSH AND ROLLER) | $28.35 | $25.21 | $53.56 |
| PIPEFITTER | $37.47 | $27.40 | $64.87 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $33.73 | $33.04 | $66.77 |
| ROOFER | $29.41 | $17.23 | $46.64 |
| OPERATOR: FORKLIFT | $32.70 | $24.12 | $56.82 |
| OPERATOR: CRANE | $40.90 | $26.78 | $67.68 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $41.10 | $19.26 | $60.36 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $43.97 | $24.17 | $68.14 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $24.77 | $6.75 | $31.52 |
| IRONWORKER, STRUCTURAL | $31.44 | $27.18 | $58.62 |
| INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $31.44 | $20.94 | $52.38 |
| PLUMBER | $37.19 | $27.89 | $65.08 |
| BRICKLAYER | $30.63 | $18.98 | $49.61 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.