Building construction wages: Chautauqua, New York
Wage determination NY20260102 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/NY20260102 on · latest revision 1 · verify at sam.gov/wage-determination/NY20260102/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TILE SETTER | $38.34 | $20.51 | $58.85 |
| BRICKLAYER | $37.88 | $24.10 | $61.98 |
| CEMENT MASON/CONCRETE FINISHER | $32.53 | $22.10 | $54.63 |
| SOFT FLOOR LAYER | $25.61 | $17.40 | $43.01 |
| CARPENTER (INCLUDES DRYWALL HANGING AND FORM WORK (EXCLUDES ACOUSTICAL CEILING INSTALLATION AND METAL STUD INSTALLATION)) | $30.65 | $21.52 | $52.17 |
| ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING) | $42.50 | $27.23 | $69.73 |
| POWER EQUIPMENT OPERATOR: CRANE | $44.23 | $35.40 | $79.63 |
| IRONWORKER: ORNAMENTAL | $35.49 | $32.30 | $67.79 |
| IRONWORKER, STRUCTURAL | $35.49 | $32.30 | $67.79 |
| IRONWORKER, REINFORCING | $35.49 | $32.30 | $67.79 |
| LABORER (COMMON OR GENERAL) | $27.68 | $22.14 | $49.82 |
| PAINTER (SPRAY) | $28.35 | $25.21 | $53.56 |
| PAINTER: BRUSH AND ROLLER | $27.25 | $25.24 | $52.49 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) | $42.20 | $29.80 | $72.00 |
| PLUMBER | $42.20 | $29.80 | $72.00 |
| ROOFER | $36.70 | $18.00 | $54.70 |
| PAINTER: DRYWALL FINISHING/TAPING | $24.81 | $21.13 | $45.94 |
| OPERATOR: FORKLIFT | $32.70 | $24.12 | $56.82 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $41.10 | $19.26 | $60.36 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $43.97 | $24.17 | $68.14 |
| MILLWRIGHT | $27.08 | $19.72 | $46.80 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $23.84 | $14.18 | $38.02 |
| INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $31.50 | $21.11 | $52.61 |
| INSTALLER: METAL STUDS | $26.70 | $17.40 | $44.10 |
| GLAZIER | $25.03 | $19.70 | $44.73 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $26.00 | $18.35 | $44.35 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.