Building construction wages: Cayuga, New York
Wage determination NY20260101 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/NY20260101 on · latest revision 1 · verify at sam.gov/wage-determination/NY20260101/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION)) | $43.25 | $27.29 | $70.54 |
| BRICKLAYER: MARBLE, TILE, AND TERRAZZO WORKERS (SYRACUSE CHAPTER) | $34.92 | $21.29 | $56.21 |
| BRICKLAYER: BRICKLAYERS, STONEMASONS, CEMENT MASONS, PLASTERERS, POINTER, CLEANERS & CAULKERS (SYRACUSE CHAPTER) | $38.30 | $23.71 | $62.01 |
| TILE SETTER | $30.69 | $20.91 | $51.60 |
| CARPENTER (EXCLUDES DRYWALL HANGING, FORM WORK AND METAL STUD INSTALLATION) | $32.64 | $21.97 | $54.61 |
| SOFT FLOOR LAYER (HARDWOOD FLOORS) | $28.90 | $21.63 | $50.53 |
| CARPENTER (FORM WORK ONLY) | $43.50 | $30.22 | $73.72 |
| CARPENTER (DRYWALL HANGING ONLY) | $43.50 | $30.22 | $73.72 |
| INSTALLER - METAL STUD | $44.72 | $31.23 | $75.95 |
| ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING) | $45.00 | $31.12 | $76.12 |
| ELEVATOR MECHANIC | $57.73 | $38.44 | $96.17 |
| POWER EQUIPMENT OPERATOR: CRANE | $61.72 | $37.50 | $99.22 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $60.13 | $37.50 | $97.63 |
| IRONWORKER: ORNAMENTAL | $35.49 | $32.30 | $67.79 |
| IRONWORKER, STRUCTURAL | $42.63 | $53.70 | $96.33 |
| IRONWORKER, REINFORCING | $42.63 | $53.70 | $96.33 |
| LABORER: COMMON OR GENERAL | $29.57 | $22.90 | $52.47 |
| PAINTER (SPRAY) | $28.35 | $25.21 | $53.56 |
| GLAZIER | $27.90 | $27.50 | $55.40 |
| PIPEFITTER | $37.47 | $27.40 | $64.87 |
| ROOFER | $50.25 | $39.62 | $89.87 |
| PAINTER (BRUSH AND ROLLER) | $25.37 | $19.91 | $45.28 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $41.10 | $19.26 | $60.36 |
| OPERATOR: FORKLIFT | $38.46 | $28.52 | $66.98 |
| PLUMBER | $37.19 | $27.89 | $65.08 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.