Residential construction wages: Niagara, New York
Wage determination NY20260086 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/NY20260086 on · latest revision 1 · verify at sam.gov/wage-determination/NY20260086/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELEVATOR MECHANIC | $62.39 | $38.44 | $100.83 |
| IRONWORKER, STRUCTURAL | $35.75 | $30.80 | $66.55 |
| IRONWORKER, ORNAMENTAL A) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING (UNPAID), CHRISTMAS DAY | $42.63 | $53.70 | $96.33 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $26.38 | $23.65 | $50.03 |
| PLUMBER | $27.44 | $23.40 | $50.84 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $19.89 | $0.00 | $19.89 |
| ROOFER | $17.92 | $0.00 | $17.92 |
| PIPEFITTER (HVAC UNIT INSTALLATION ONLY) | $18.96 | $2.77 | $21.73 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $14.14 | $3.76 | $17.90 |
| PAINTER (BRUSH AND ROLLER), EXCLUDES DRYWALL FINISHING/TAPING | $17.49 | $0.00 | $17.49 |
| OPERATOR: LOADER | $27.88 | $21.40 | $49.28 |
| OPERATOR: BULLDOZER | $21.20 | $0.00 | $21.20 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $27.51 | $18.41 | $45.92 |
| LABORER: MASON TENDER - BRICK | $18.03 | $0.00 | $18.03 |
| LABORER: LANDSCAPE | $13.65 | $1.09 | $14.74 |
| LABORER: COMMON OR GENERAL | $13.11 | $0.00 | $13.11 |
| IRONWORKER, REINFORCING | $27.06 | $23.02 | $50.08 |
| INSULATOR - BATT | $15.12 | $0.00 | $15.12 |
| ELECTRICIAN | $20.56 | $7.00 | $27.56 |
| CEMENT MASON/CONCRETE FINISHER | $20.53 | $2.15 | $22.68 |
| CARPENTER, EXCLUDES BATT INSTALLATION, DRYWALL HANGING AND METAL STUD INSTALLATION AND DRYWALL FINISHING/TAPING | $19.67 | $7.91 | $27.58 |
| CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | $15.55 | $4.64 | $20.19 |
| CARPENTER (DRYWALL FINISHING/TAPING ONLY) | $20.22 | $4.64 | $24.86 |
| BRICKLAYER | $29.57 | $0.00 | $29.57 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.