Building construction wages: Yates, New York
Wage determination NY20260073 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/NY20260073 on · latest revision 2 · verify at sam.gov/wage-determination/NY20260073/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-30 | original |
Current rates (rev 2)
The CSV and the printed sheet are snapshots of rev 2. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $39.35 | $33.18 | $72.53 |
| TILE FINISHER (ROCHESTER CHAPTER) | $31.06 | $22.92 | $53.98 |
| BRICKLAYER (ROCHESTER CHAPTER) | $35.81 | $27.65 | $63.46 |
| CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK | $32.64 | $21.97 | $54.61 |
| ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING FOR PHONES, ALARMS AND HVAC TEMPERATURE CONTROLS & INSTALLATION OF ALARMS, PHONES AND COMPUTERS) | $45.00 | $31.12 | $76.12 |
| ELEVATOR MECHANIC | $61.52 | $38.44 | $99.96 |
| POWER EQUIPMENT OPERATOR: FORKLIFT FACTORY RATED UNDER 15 FEET | $42.34 | $35.20 | $77.54 |
| POWER EQUIPMENT OPERATOR: FORKLIFT FACTORY RATED 15 FEET & OVER | $42.34 | $35.20 | $77.54 |
| POWER EQUIPMENT OPERATOR: EXCEPT TRACTOR-MOUNTED, RUBBER TIRED (BACKHOE) | $43.14 | $35.20 | $78.34 |
| POWER EQUIPMENT OPERATOR: BULLDOZER; CONCRETE PUMP, TRUCK MOUNTED; CRANE; DRILL; EXCAVATOR | $42.34 | $35.20 | $77.54 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER; CRANE OILER; LOADER | $42.34 | $35.20 | $77.54 |
| POWER EQUIPMENT OPERATOR: BACKHOE TRACTOR MOUNTED, RUBBER TIRED | $42.34 | $35.20 | $77.54 |
| IRONWORKER-FENCE ERECTOR | $35.75 | $30.80 | $66.55 |
| IRONWORKER, ORNAMENTAL, REINFORCING AND STRUCTURAL | $35.75 | $30.80 | $66.55 |
| LABORER LANDSCALE | $26.22 | $21.49 | $47.71 |
| LABORER (COMMON OR GENERAL; GRADE CHECKER; BRICK MASON TENDER; CEMENT/CONCRETE MASON TENDER; MORTAR MIXER) | $29.07 | $21.49 | $50.56 |
| PAINTER: SPRAY | $27.60 | $26.00 | $53.60 |
| PAINTER: BRUSH & ROLLER | $27.00 | $26.00 | $53.00 |
| GLAZIER | $31.05 | $31.55 | $62.60 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $42.68 | $27.88 | $70.56 |
| ROOFER, INCLUDES ROOF TEAR OFF, AND INSTALLATION OF MODIFIED BITUMEN, RUBBER, SHAKE & SHINGLE, AND SINGLE PLY ROOFS | $34.10 | $28.20 | $62.30 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $45.06 | $30.71 | $75.77 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $43.01 | $28.66 | $71.67 |
| TRUCK DRIVER: DUMP TRUCK | $16.00 | $2.62 | $18.62 |
| TILE SETTER | $24.02 | $0.00 | $24.02 |
| PLUMBER | $27.15 | $12.47 | $39.62 |
| OPERATOR: ROLLER | $24.15 | $17.01 | $41.16 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $23.59 | $9.95 | $33.54 |
| OPERATOR: AUGER | $21.19 | $15.85 | $37.04 |
| LABORER: PIPELAYER | $21.06 | $14.30 | $35.36 |
| LABORER: ASPHALT SHOVELER | $20.89 | $8.95 | $29.84 |
| LABORER: ASBESTOS ABATEMENT (REMOVAL FROM CEILINGS, FLOORS, AND WALLS) | $18.70 | $8.28 | $26.98 |
| INSULATOR - PIPE & PIPEWRAPPER | $27.72 | $9.00 | $36.72 |
| CEMENT MASON/CONCRETE FINISHER | $20.32 | $8.84 | $29.16 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.