Building construction wages: Tompkins, New York
Wage determination NY20260051 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/NY20260051 on · latest revision 2 · verify at sam.gov/wage-determination/NY20260051/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-30 | original |
Current rates (rev 2)
The CSV and the printed sheet are snapshots of rev 2. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| MARBLE MASONS, TILE LAYERS, AND TERRAZZO WORKERS: BUILDING CONSTRUCTION (ITHACA CHAPTER) | $34.24 | $23.61 | $57.85 |
| CEMENT MASONS: HEAVY/HIGHWAY (ITHACA CHAPTER) | $38.63 | $25.05 | $63.68 |
| CARPENTER | $31.59 | $23.24 | $54.83 |
| ELECTRICIANS: ELECTRICIANS (GROTON TOWNSHIP ONLY) | $50.50 | $35.03 | $85.53 |
| ELECTRICIANS: CABLE SPLICING (GROTON TOWNSHIP ONLY) | $55.55 | $35.03 | $90.58 |
| ELECTRICIAN | $44.50 | $31.89 | $76.39 |
| ELEVATOR MECHANIC | $58.44 | $38.44 | $96.88 |
| POWER EQUIPMENT OPERATORS: BULLDOZER | $44.99 | $31.85 | $76.84 |
| POWER EQUIPMENT OPERATORS: BACKHOE, CHERRY PICKER, EXCAVATOR, AND LOADER | $48.11 | $31.85 | $79.96 |
| IRONWORKER (STRUCTURAL, ORNAMENTAL, REINFORCING, PRE-CAST CONCRETE ERECTOR, MACHINERY MOVER & RIGGER, FENCE ERECTOR, STONE DERRICK-MAN, WELDER, SHEETER, SHEETER BUCKER-UP) | $37.16 | $30.68 | $67.84 |
| LABORERS: COMMON LABORERS (BUILDING CONSTRUCTION) | $26.50 | $22.71 | $49.21 |
| LABORERS: ASBESTOS TOXIC WASTE; BLASTERS; FORK LIFT OPERATOR (IN CONNECTION WITH MASONARY WORK) | $28.50 | $22.71 | $51.21 |
| LABORERS: AIR TOOLS OPERATOR (BUILDING CONSTRUCTION) | $27.50 | $22.71 | $50.21 |
| PAINTERS: (SWING & SCAFFOLD, BOSUN CHAIR, STRUCTURAL STEEL, WINDOW PLATFORM) | $28.80 | $24.73 | $53.53 |
| PAINTERS: (SPRAY PAINTING) | $29.70 | $24.73 | $54.43 |
| PAINTERS: (SPRAY EPOXY) | $29.10 | $24.73 | $53.83 |
| PAINTERS: (SANDBLASTING) | $29.10 | $24.73 | $53.83 |
| PAINTERS: (BRUSH & ROLL EPOXY) | $29.30 | $24.73 | $54.03 |
| PLUMBER, PIPEFITTER, STEAMFITTER (INCLUDING HVAC WORK) | $35.51 | $24.57 | $60.08 |
| ROOFER | $30.50 | $19.84 | $50.34 |
| SPRINKLER FITTER | $47.85 | $28.94 | $76.79 |
| SHEET METAL WORKER | $35.94 | $20.89 | $56.83 |
| INSULATOR - PIPE & PIPEWRAPPER | $19.59 | $7.06 | $26.65 |
| GLAZIER | $13.75 | $4.43 | $18.18 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.